Adaptive control for safe and quality rebar fabrication

被引:11
作者
Dunston, PS [1 ]
Bernold, LE
机构
[1] Univ Washington, Dept Civil & Environm Engn, Seattle, WA 98195 USA
[2] N Carolina State Univ, Dept Civil Engn, Raleigh, NC 27695 USA
关键词
D O I
10.1061/(ASCE)0733-9364(2000)126:2(122)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Rebar fabrication is a labor intensive operation that uses scrap or "trash" steel For raw materials and therefore can benefit greatly from improvements in safety, productivity, and quality. Shared control through a human-machine interface may be the best alternative for achieving highest quality standards and improving worker performance in safety and productivity. This paper develops a control scheme for automated rebar bending within the framework of computer integrated construction and presents research focused on the task level control to compensate for springback in the bent rebar. Three major problems are addressed: (1) Conception of a hierarchical computer integrated construction control structure that links rebar Fabrication to the other construction project functions: (2) comparative evaluation of alternative algorithms For prediction of springback; and (3) portability of a springback control model that uses real-time electronic sensing. Bending tests were conducted with both a laboratory prototype and an actual shop table bender to experiment with alternative models for in-process springback prediction including a neural network model. Limitations in control system portability were realized in the transfer from the laboratory prototype bender to the shop bender. Springback model evaluations revealed that empirical statistical models, neural networks, and in-process relaxation performed equally well.
引用
收藏
页码:122 / 129
页数:8
相关论文
共 58 条
[41]  
POND RJ, 1994, FUNDAMENTALS STAT QU
[42]  
RAIBERT MH, 1981, T ASME, V102, P126
[43]   Web-centric systems: A new paradigm for collaborative engineering [J].
Rojas, EM ;
Songer, AD .
JOURNAL OF MANAGEMENT IN ENGINEERING, 1999, 15 (01) :39-45
[44]   USE OF SENSORS IN PROGRAMMABLE AUTOMATION [J].
ROSEN, CA ;
NITZAN, D .
COMPUTER, 1977, 10 (12) :12-23
[45]  
RUCKER W, 1993, CONSTR BUSINESS REV, V3, P54
[46]   EFFECTS OF DESIGN-INTEGRATED PROCESS PLANNING ON PRODUCTIVITY IN REBAR PLACEMENT [J].
SALIM, M ;
BERNOLD, LE .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1994, 120 (04) :720-738
[47]  
SALIM M, 1992, P 8 C COMP CIV ENG A, P872
[48]  
SHIMANO B, 1984, P IEEE INT C ROBOTIC, P278
[49]   AN ADAPTIVE PRESSBRAKE CONTROL USING AN ELASTIC-PLASTIC MATERIAL MODEL [J].
STELSON, KA ;
GOSSARD, DC .
JOURNAL OF ENGINEERING FOR INDUSTRY-TRANSACTIONS OF THE ASME, 1982, 104 (04) :389-393
[50]  
STRASSER F, 1962, DES ENG JAN, P22