Identifying critical activities in stochastic resource constrained networks

被引:10
作者
Bowers, J
机构
[1] University of Stirling, Stirling
[2] Dept. of Management and Organization, School of Management, University of Stirling
来源
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE | 1996年 / 24卷 / 01期
关键词
project management; resource management; risk; simulation; control;
D O I
10.1016/0305-0483(95)00046-1
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The analysis of the stochastic project network can provide indications of both the magnitude of temporal risk and the sources of that risk, In a project dominated by technological dependencies rather than resource constraints, the sources of risk can be identified by examining the probabilities of each activity lying on a critical path. Similar criticality probabilities can also be derived for resource constrained stochastic networks if tbe definition of the critical path is revised. The use of this revised criticality probability is illustrated in an analysis of an example project and other possible measures of identifying the important activities are considered, A quantitative test of the value of the information provided by the criticality probability is developed and applied to a set of 100 randomly generated project networks, comparing the possible measures. This test indicates that the criticality probability provides valuable management information, extending the familiar concept of the critical path to the resource constrained stochastic network.
引用
收藏
页码:37 / 46
页数:10
相关论文
共 16 条
[1]  
ADLAKHA VG, 1989, INFOR, V27, P272
[2]  
[Anonymous], INT J PROJ MANAG
[3]   CRITICALITY IN RESOURCE CONSTRAINED NETWORKS [J].
BOWERS, JA .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1995, 46 (01) :80-91
[4]   PROJECT SCHEDULING WITH RESOURCE CONSTRAINTS - A BRANCH AND BOUND APPROACH [J].
CHRISTOFIDES, N ;
ALVAREZVALDES, R ;
TAMARIT, JM .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1987, 29 (03) :262-273
[5]   COMPARISON OF HEURISTIC AND OPTIMUM SOLUTIONS IN RESOURCE-CONSTRAINED PROJECT SCHEDULING [J].
DAVIS, EW ;
PATTERSON, JH .
MANAGEMENT SCIENCE SERIES B-APPLICATION, 1975, 21 (08) :944-955
[6]   A RANDOM ACTIVITY NETWORK GENERATOR [J].
DEMEULEMEESTER, E ;
DODIN, B ;
HERROELEN, W .
OPERATIONS RESEARCH, 1993, 41 (05) :972-980
[7]   APPROXIMATING THE CRITICALITY INDEXES OF THE ACTIVITIES IN PERT NETWORKS [J].
DODIN, BM ;
ELMAGHRABY, SE .
MANAGEMENT SCIENCE, 1985, 31 (02) :207-223
[8]   ESTIMATING CRITICAL PATH AND ARC PROBABILITIES IN STOCHASTIC ACTIVITY NETWORKS [J].
FISHMAN, GS .
NAVAL RESEARCH LOGISTICS, 1985, 32 (02) :249-261
[9]   Usage and benefits of projects risk analysis and management [J].
Simister, Steve J. .
International Journal of Project Management, 1994, 12 (01) :5-8
[10]  
SOROUSH HM, 1994, J OPER RES SOC, V45, P287, DOI 10.1038/sj/jors/0450306