Sustainability in manufacturing operations scheduling: A state of the art review

被引:190
作者
Giret, Adriana [1 ]
Trentesaux, Damien [2 ]
Prabhu, Vittal [3 ]
机构
[1] Univ Politecn Valencia, Dept Comp Sci, E-46022 Valencia, Spain
[2] Univ Valenciennes & Hainaut Cambresis, CNRS, LAMIH UMR 8201, F-59313 Valenciennes, France
[3] Penn State Univ, Marcus Dept Ind & Mfg Engn, University Pk, PA 16802 USA
关键词
Sustainability; Manufacturing operations; Scheduling; Production control; Multicriteria optimization; TOTAL-ENERGY CONSUMPTION; TOTAL WEIGHTED TARDINESS; POWER-CONSUMPTION; DECISION-MAKING; OPTIMIZATION; EFFICIENCY; SYSTEMS; SIMULATION; MINIMIZATION; FRAMEWORK;
D O I
10.1016/j.jmsy.2015.08.002
中图分类号
T [工业技术];
学科分类号
120111 [工业工程];
摘要
Sustainability in manufacturing systems is an urgent requirement for today's manufacturing companies. This paper focuses on sustainable manufacturing operations scheduling, a subject which has been attracting increasing interest from researchers in recent years. This paper presents a state of the art review of this field. First, it characterizes what can be considered as sustainable manufacturing operations scheduling, and introduces the relevant challenges and issues. An analysis of the literature is then proposed, and organized according to three keys. The shortcomings in the literature are then discussed in depth, and subsequently urgent problems that must be solved through research in order to meet industry requirements are pointed out. (C) 2015 The Society of Manufacturing Engineers. Published by Elsevier Ltd. All rights reserved.
引用
收藏
页码:126 / 140
页数:15
相关论文
共 94 条
[1]
Effective scheduling of a large-scale paint production system [J].
Adonyi, Robert ;
Biros, Gabor ;
Holczinger, Tibor ;
Friedler, Ferenc .
JOURNAL OF CLEANER PRODUCTION, 2008, 16 (02) :225-232
[2]
[Anonymous], 1987, OUR COMMON FUTURE
[3]
[Anonymous], 2012, Scheduling
[4]
The energy scheduling problem: Industrial case-study and constraint propagation techniques [J].
Artigues, Christian ;
Lopez, Pierre ;
Hait, Alain .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 143 (01) :13-23
[5]
Badurdeen Fazleena, 2009, International Journal of Product Lifecycle Management, V4, P49, DOI 10.1504/IJPLM.2009.031666
[6]
Optimization methods applied to renewable and sustainable energy: A review [J].
Banos, R. ;
Manzano-Agugliaro, F. ;
Montoya, F. G. ;
Gil, C. ;
Alcayde, A. ;
Gomez, J. .
RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2011, 15 (04) :1753-1766
[7]
BRANDIMARTE P, 1999, MODELING MANUFACTURI
[8]
Resource-constrained project scheduling: Notation, classification, models, and methods [J].
Brucker, P ;
Drexl, A ;
Mohring, R ;
Neumann, K ;
Pesch, E .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 112 (01) :3-41
[9]
Energy-aware scheduling for improving manufacturing process sustainability: A mathematical model for flexible flow shops [J].
Bruzzone, A. A. G. ;
Anghinolfi, D. ;
Paolucci, M. ;
Tonelli, F. .
CIRP ANNALS-MANUFACTURING TECHNOLOGY, 2012, 61 (01) :459-462
[10]
Integrating energy efficiency performance in production management - gap analysis between industrial needs and scientific literature [J].
Bunse, Katharina ;
Vodicka, Matthias ;
Schoensleben, Paul ;
Bruelhart, Marc ;
Ernst, Frank O. .
JOURNAL OF CLEANER PRODUCTION, 2011, 19 (6-7) :667-679