4D dynamic management for construction planning and resource utilization

被引:107
作者
Wang, HJ
Zhang, JP [1 ]
Chau, KW
Anson, M
机构
[1] Tsinghua Univ, Dept Civil Engn, Beijing 100084, Peoples R China
[2] Hong Kong Polytech Univ, Dept Civil & Struct Engn, Hong Kong, Hong Kong, Peoples R China
关键词
4D Site Management Model; 4D Management for Construction Planning and Resource Utilization; 4D technology;
D O I
10.1016/j.autcon.2004.04.003
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The requirements, nowadays, for more effective planning and management assistance from computer have become even more demanding. In this paper, our 4D model, 4D Site Management Model+ (4DSMM+), is described, a model developed in an attempt to address the requirement for linking scheduling data to a 3D computer graphics building model, which will allow planners to perform graphic simulations of the construction process. Compared to other 4D models and our earlier research, the current model extends 4D technology into the areas of resource management and site space utilization, in addition to the planning of building construction. A new information system platform, 4D Management for Construction Planning and Resource Utilization (4D-MCPRU), has been developed in this research, in order to implement the model 4DSMM+, which integrates dynamic resource management at the project level and decision-making support with the other features, This paper discusses features of the newly extended model and describes the underlying techniques needed for applying the model in construction management practice. (C) 2004 Elsevier B.V. All rights reserved.
引用
收藏
页码:575 / 589
页数:15
相关论文
共 13 条
  • [1] A library-based 4D visualisation of construction processes
    AdjeiKumi, T
    Retik, A
    [J]. 1997 IEEE CONFERENCE ON INFORMATION VISUALIZATION, PROCEEDINGS: AN INTERNATIONAL CONFERENCE ON COMPUTER VISUALIZATION & GRAPHICS, 1997, : 315 - 321
  • [2] [Anonymous], 1995, 101 CIFE STANF U
  • [3] CAO Y, 2000, P INT C ENG TECHN SC, P645
  • [4] FISCHER M, COMP CONSTR 2000 A E
  • [5] HOWARD HC, 1995, CIB P, V180, P523
  • [6] Feasibility study of 4D CAD in commercial construction
    Koo, B
    Fischer, M
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2000, 126 (04): : 251 - 260
  • [7] LI Z, 2001, CONSTRUCTION MANAGEM, V19, P459, DOI DOI 10.1080/01446190110044825
  • [8] Liston KM, 1998, COMPUTING IN CIVIL ENGINEERING, P330
  • [9] McKinney K., 1998, Automation in Construction, V7, P433, DOI 10.1016/S0926-5805(98)00053-3
  • [10] McKinney K., 1996, P 3 C COMP CIV ENG A, P383