Dynamic optimal ground water remediation including fixed and operation costs

被引:18
作者
Chang, LC
Hsiao, CT
机构
[1] Natl Chiao Tung Univ, Dept Civil Engn, Hsinchu 300, Taiwan
[2] Chungchou Inst Technol, Dept Informat Management, Merida 5101, Venezuela
关键词
D O I
10.1111/j.1745-6584.2002.tb02532.x
中图分类号
P [天文学、地球科学];
学科分类号
07 ;
摘要
lit time-varying ground water remediation, the lack of an optimal control algorithm to simultaneously consider fixed costs and time-varying operating costs makes it nearly impossible to obtain an optimal solution. This study presents a novel algorithm that integrates a genetic algorithm (GA) and constrained differential dynamic programming (CDDP) to solve this time-varying ground water remediation problem. A GA can easily incorporate the fixed costs associated with the installation of wells. However, using a GA to solve for time-varying policies would dramatically increase the computational resources required. Therefore, the CDDP is used to handle the subproblems associated with time-varying operating costs. A hypothetical case study that incorporates fixed and time-varying operating costs is presented to demonstrate the effectiveness of the proposed algorithm. Simulation results indicate that the fixed costs can significantly influence the number and locations of wells, and a notable total cost savings can be realized by applying the novel algorithm herein.
引用
收藏
页码:481 / 490
页数:10
相关论文
共 28 条
[1]   CONTAMINATED GROUNDWATER REMEDIATION DESIGN USING SIMULATION, OPTIMIZATION, AND SENSITIVITY THEORY .1. MODEL DEVELOPMENT [J].
AHLFELD, DP ;
MULVEY, JM ;
PINDER, GF ;
WOOD, EF .
WATER RESOURCES RESEARCH, 1988, 24 (03) :431-441
[2]   Comparison of a genetic algorithm and mathematical programming to the design of groundwater cleanup systems [J].
Aly, AH ;
Peralta, PC .
WATER RESOURCES RESEARCH, 1999, 35 (08) :2415-2425
[3]   OPTIMIZATION OF THE PUMPING SCHEDULE IN AQUIFER REMEDIATION UNDER UNCERTAINTY [J].
ANDRICEVIC, R ;
KITANIDIS, PK .
WATER RESOURCES RESEARCH, 1990, 26 (05) :875-885
[4]   OPTIMAL TIME-VARYING PUMPING RATES FOR GROUNDWATER REMEDIATION - APPLICATION OF A CONSTRAINED OPTIMAL-CONTROL ALGORITHM [J].
CHANG, LC ;
SHOEMAKER, CA ;
LIU, PLF .
WATER RESOURCES RESEARCH, 1992, 28 (12) :3157-3173
[5]   Dynamic optimal ground-water reclamation with treatment capital costs [J].
Culver, TB ;
Shoemaker, CA .
JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT-ASCE, 1997, 123 (01) :23-29
[6]   DYNAMIC OPTIMAL-CONTROL FOR GROUNDWATER REMEDIATION WITH FLEXIBLE MANAGEMENT PERIODS [J].
CULVER, TB ;
SHOEMAKER, CA .
WATER RESOURCES RESEARCH, 1992, 28 (03) :629-641
[7]   Dynamic optimal ground water remediation by granular activated carbon [J].
Culver, TB ;
Shenk, GW .
JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT-ASCE, 1998, 124 (01) :59-64
[8]   OPTIMAL-CONTROL FOR GROUNDWATER REMEDIATION BY DIFFERENTIAL DYNAMIC-PROGRAMMING WITH QUASI-NEWTON APPROXIMATIONS [J].
CULVER, TB ;
SHOEMAKER, CA .
WATER RESOURCES RESEARCH, 1993, 29 (04) :823-831
[9]  
DEJONG KA, 1975, THESIS U MICHIGAN AN
[10]  
GOLDBERG DE, 1989, GENETIC ALGORITHM SE