Evaluating multiple reliability indices of regional networks in wide area measurement system

被引:38
作者
Wang, Yang [1 ]
Li, Wenyuan [2 ]
Lu, Jiping
Liu, Honghong [3 ]
机构
[1] Chongqing Univ, Coll Elect Engn, State Key Lab Power Transmiss Equipment & Syst Se, Chongqing 400030, Peoples R China
[2] British Columbia Transmiss Corp, Vancouver, BC V7X 1V5, Canada
[3] Sichuan Bashu Jiangyou Power Plant, Jiangyou City, Peoples R China
关键词
Communication network; Survival mechanism; Reliability evaluation; WAMS;
D O I
10.1016/j.epsr.2009.04.005
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The paper presents a hierarchical structure of Wide Area Measurement System (WAMS) that can satisfy requirements of reliable real-time data transfer. The methods of calculating multiple reliability indices of WAMS regional networks in the protection and recovery survival mechanisms are developed and an equivalent two-state model of a WAMS regional network is presented. The numerical results of an example indicate that the meshed WAMS regional network can provide a very high reliability level. The reliability of the regional network can be enhanced by selecting an appropriate location of Phasor Data Center (PDC) or by improving availability of crucial optic fiber links in the protection mechanism. In the dynamic recovery mechanism, however, these measures may not be effective and thus the key consideration should be put on how to timely restore data transfers after a communication contingency. Crown Copyright (C) 2009 Published by Elsevier B.V. All rights reserved.
引用
收藏
页码:1353 / 1359
页数:7
相关论文
共 21 条
  • [1] [Anonymous], 2005, Risk Assessment Of Power Systems: Models, Methods, and Applications
  • [2] [Anonymous], 1992, RELIABILITY EVALUATI
  • [3] ANTONOPOULOS A, 1997, P 2 IEEE S COMP COMM
  • [4] Engineering end-to-end IP resilience using resilience-differentiatedce differentiated QoS
    Autenrieth, A
    Kirstädter, A
    [J]. IEEE COMMUNICATIONS MAGAZINE, 2002, 40 (01) : 50 - 57
  • [5] Wide-area protection and emergency control
    Begovic, M
    Novosel, D
    Karlsson, D
    Henville, C
    Michel, G
    [J]. PROCEEDINGS OF THE IEEE, 2005, 93 (05) : 876 - 891
  • [6] Bibliography on the application of probability methods in power system reliability evaluation 1996-1999
    Billinton, R
    Fotuhi-Firuzabad, M
    Bertling, L
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2001, 16 (04) : 595 - 602
  • [7] A cut-based method for terminal-pair reliability
    Chen, YG
    Yuang, MC
    [J]. IEEE TRANSACTIONS ON RELIABILITY, 1996, 45 (03) : 413 - 416
  • [8] DONNELLY M, 2006, P 39 HAW INT C SYST
  • [9] FAHID KA, 2007, P BULK POW SYST DYN, P1
  • [10] GUOLONG Z, 2003, OPTICAL NETWORK TECH, V27, P13