Multi-objective lot splitting for a single product m-machine flowshop line

被引:23
作者
Bukchin, J
Masin, M [2 ]
机构
[1] Tel Aviv Univ, Fac Engn, Dept Ind Engn, Tel Aviv, Israel
[2] Penn State Univ, Harold & Inge Marcus Dept Ind & Mfg Engn, University Pk, PA 16802 USA
关键词
D O I
10.1080/07408170490245487
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, the mean flowtime and the makespan objectives are simultaneously investigated in a single product, m-machine, flowshop system. For this purpose, an efficiency frontier approach is applied and an optimal algorithm for generating all efficient solutions is developed. A comprehensive computational experiment is performed for analyzing the tradeoff between the two objectives and evaluating the proposed algorithm performance. The most-balanced-solution, MinMax, is defined and recommended as a desirable alternative for either the flowtime or the makespan optimal solutions. Results show that when the system is optimized for either the mean flowtime or the makespan, a significant loss in the nonoptimized objective value is observed. On the other hand, adopting the MinMax solution obtains a close to optimal solution in both objectives.
引用
收藏
页码:191 / 202
页数:12
相关论文
共 27 条
[1]  
[Anonymous], ELEMENTS SEQUENCING
[2]   A COMPARATIVE-STUDY OF LOT STREAMING PROCEDURES [J].
BAKER, KR ;
JIA, D .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1993, 21 (05) :561-566
[3]   SOLUTION PROCEDURES FOR THE LOT-STREAMING PROBLEM [J].
BAKER, KR ;
PYKE, DF .
DECISION SCIENCES, 1990, 21 (03) :475-491
[4]  
Bellman R., 1957, DYNAMIC PROGRAMMING
[5]   Lot splitting to minimize average flow-time in two-machine flow-shop [J].
Bukchin, J ;
Tzur, M ;
Jaffe, M .
IIE TRANSACTIONS, 2002, 34 (11) :953-970
[6]  
Chen JA, 1998, IIE TRANS, V30, P1075, DOI 10.1023/A:1007563814941
[7]  
Cheng TCE, 1996, IIE TRANS, V28, P953
[8]   HEURISTIC ESTIMATION OF THE EFFICIENT FRONTIER FOR A BICRITERIA SCHEDULING PROBLEM [J].
DE, P ;
GHOSH, JB ;
WELLS, CE .
DECISION SCIENCES, 1992, 23 (03) :596-609
[9]   BATCHING TO MINIMIZE FLOW TIMES ON ONE MACHINE [J].
DOBSON, G ;
KARMARKAR, US ;
RUMMEL, JL .
MANAGEMENT SCIENCE, 1987, 33 (06) :784-799
[10]   BATCHING TO MINIMIZE FLOW TIMES ON PARALLEL HETEROGENEOUS MACHINES [J].
DOBSON, G ;
KARMARKAR, US ;
RUMMEL, JL .
MANAGEMENT SCIENCE, 1989, 35 (05) :607-613