Stochastic multiobjective generation allocation using pattern-search method

被引:6
作者
Bath, S. K. [1 ]
Dhillon, J. S.
Kothari, D. P.
机构
[1] GZS Coll Engn & Technol, Dept Elect Engn, Bhatinda 151001, Punjab, India
[2] St Longowal Inst Engn & Technol, Elect & Instrumentat Engn Dept, Sangrur 148106, Punjab, India
[3] Indian Inst Technol, Ctr Energy Studies, New Delhi 110016, India
关键词
D O I
10.1049/ip-gtd:20050087
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
In a stochastic multiobjective framework, fuzzy decision-making methodology is exploited to decide the generation schedule of committed thermal stations. The multiobjective problem is formulated considering objectives Eke fuel cost, gaseous pollutant emission, variance of active and reactive generation mismatch, and a voltage profile minimisation to avoid violation of active power-line flow limits with explicit recognition of statistical uncertainties in the thermal generation cost, gaseous emission curves, real and reactive power demand and voltage magnitude at each bus, which are random variables. Equality and inequality network constraints are also incorporated as objectives to be optimised. Objectives of a fuzzy nature are quantified by defining their membership functions. The problem is solved sequentially in the decoupled form. The Hooke-Jeeves method has been employed to generate noninferior solutions within minimum and maximum limits of power generation. The min-max technique is used to select the optimal solution interactively. This technique has the advantage to maximise the most underachieved objective also. A IEEE five-generator, 25-bus and 35-line power system has been used to demonstrate the applicability of the method.
引用
收藏
页码:476 / 484
页数:9
相关论文
共 9 条
  • [1] Arya L. D., 1997, Journal of the Institution of Engineers (India) Electrical Engineering Division, V77, P229
  • [2] Line outage ranking for voltage limit violations with corrective rescheduling avoiding masking
    Arya, LD
    Choube, SC
    Kothari, DP
    [J]. INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2001, 23 (08) : 837 - 846
  • [3] Reactive power optimization using static voltage stability index
    Arya, LD
    Choube, SC
    Kothari, DP
    [J]. ELECTRIC POWER COMPONENTS AND SYSTEMS, 2001, 29 (07) : 615 - 628
  • [4] ALLEVIATION OF LINE OVERLOADS AND VOLTAGE VIOLATIONS BY CORRECTIVE RESCHEDULING
    BIJWE, PR
    KOTHARI, DP
    ARYA, LD
    [J]. IEE PROCEEDINGS-C GENERATION TRANSMISSION AND DISTRIBUTION, 1993, 140 (04) : 249 - 255
  • [5] Multiobjective load dispatch by fuzzy logic based searching weightage pattern
    Brar, YS
    Dhillon, JS
    Kothari, DP
    [J]. ELECTRIC POWER SYSTEMS RESEARCH, 2002, 63 (02) : 149 - 160
  • [6] Stochastic multiobjective generation dispatch of combined heat and power systems
    Chang, CS
    Fu, W
    [J]. IEE PROCEEDINGS-GENERATION TRANSMISSION AND DISTRIBUTION, 1998, 145 (05) : 583 - 591
  • [7] STOCHASTIC ECONOMIC EMISSION LOAD DISPATCH
    DHILLON, JS
    PARTI, SC
    KOTHARI, DP
    [J]. ELECTRIC POWER SYSTEMS RESEARCH, 1993, 26 (03) : 179 - 186
  • [8] Fuzzy decision-making in stochastic multiobjective short-term hydrothermal scheduling
    Dhillon, JS
    Parti, SC
    Kothari, DP
    [J]. IEE PROCEEDINGS-GENERATION TRANSMISSION AND DISTRIBUTION, 2002, 149 (02) : 191 - 200
  • [9] Economic emission load dispatch through an interactive fuzzy satisfying method
    Hota, PK
    Chakrabarti, R
    Chattopadhyay, PK
    [J]. ELECTRIC POWER SYSTEMS RESEARCH, 2000, 54 (03) : 151 - 157