Disassembly analysis for electromechanical products: a graph-based heuristic approach

被引:70
作者
Kuo, TC [1 ]
Zhang, HC
Huang, SH
机构
[1] Shu Teh Inst Technol & Commerce, Dept Ind Engn & Management, Taichung, Taiwan
[2] Texas Tech Univ, Dept Ind Engn, Lubbock, TX 79409 USA
[3] Univ Toledo, Dept Mech Ind & Mfg Engn, Toledo, OH 43606 USA
关键词
D O I
10.1080/002075400188988
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Original equipment manufacturers are facing more pressure to improve the recyclability of their products. The concept of environmentally conscious design and manufacturing has been adopted in an effort to improve the environmental compatibility of manufactured goods. This new trend requires that environmental considerations be incorporated into design strategies. This paper presents a graph-based heuristic approach to perform disassembly analysis for electromechanical products. The components of a product and their assembly relationships are represented using a component-fastener graph. A cut-vertex search procedure is used to split the graph into sub-graphs representing modular sub-assemblies. Disassembly precedence analysis is then applied to generate a disassembly tree, From which a disassembly sequence can be derived. The results of the analysis can be used by designers to evaluate the 'disassemblability' and 'recyclability' of products they are designing. Desirable changes can then be made at the early stage of design.
引用
收藏
页码:993 / 1007
页数:15
相关论文
共 23 条
  • [1] ALTING L, 1993, MANUFACTURING BR MAY, P29
  • [2] AN INTEGRATED COMPUTER AID FOR GENERATING AND EVALUATING ASSEMBLY SEQUENCES FOR MECHANICAL PRODUCTS
    BALDWIN, DF
    ABELL, TE
    LUI, MCM
    DEFAZIO, TL
    WHITNEY, DE
    [J]. IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 1991, 7 (01): : 78 - 94
  • [3] BONESCHANSCHER N, 1989, INT FED AUT CONTR IN
  • [4] Bourjault A., 1984, Contribution a une approche methodologique de l'assemblage automatise: elaboration automatique des sequences operatoires
  • [5] OPERATIONS PLANNING ISSUES IN AN ASSEMBLY DISASSEMBLY ENVIRONMENT
    BRENNAN, L
    GUPTA, SM
    TALEB, KN
    [J]. INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 1994, 14 (09) : 57 - 67
  • [6] A CORRECT AND COMPLETE ALGORITHM FOR THE GENERATION OF MECHANICAL ASSEMBLY SEQUENCES
    DEMELLO, LSH
    SANDERSON, AC
    [J]. IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 1991, 7 (02): : 228 - 240
  • [7] CAD-DIRECTED AUTOMATIC ASSEMBLY SEQUENCE PLANNING
    GU, P
    YAN, X
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1995, 33 (11) : 3069 - 3100
  • [8] HEEMSKERK CJM, 1987, P 1 EUR S ASS AUT VE
  • [9] JOVANE F, 1993, ANN CIRP, V42, P1
  • [10] KITAJIMA K, 1984, COMPUTER AIDED DESIG, V16