Minimizing mean flowtime in a two-machine flowshop with sequence-independent setup times

被引:41
作者
Allahverdi, A [1 ]
机构
[1] Kuwait Univ, Coll Engn & Petr, Dept Mech & Ind Engn, Safat 13060, Kuwait
关键词
scheduling; flowshop; mean flowtime; separate setup time; heuristic;
D O I
10.1016/S0305-0548(99)00010-6
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper addresses the two-machine flowshop problem to minimize mean flowtime where setup times are separated and sequence independent. Optimal solutions are obtained for two special cases. For the general case, two dominance relations are established and their effectiveness in a branch-and-bound algorithm is evaluated. It is shown that problems up to 35 jobs can be solved optimally in a reasonable time. Moreover, for the general case, three heuristic algorithms are proposed to find an approximate solution for larger problems, and they are empirically evaluated to assess their effectiveness in finding the optimal solution. Computational results show that one of the heuristic algorithms has an overall average error of 0.7% from the optimal value and that the error is independent of the number of jobs.
引用
收藏
页码:111 / 127
页数:17
相关论文
共 39 条
  • [1] Scheduling in stochastic flowshops with independent setup, processing and removal times
    Allahverdi, A
    [J]. COMPUTERS & OPERATIONS RESEARCH, 1997, 24 (10) : 955 - 960
  • [2] A review of scheduling research involving setup considerations
    Allahverdi, A
    Gupta, JND
    Aldowaisan, T
    [J]. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1999, 27 (02): : 219 - 239
  • [3] Job lateness in flowshops with setup and removal times separated
    Allahverdi, A
    Aldowaisan, T
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1998, 49 (09) : 1001 - 1006
  • [4] ALLAHVERDI A, 1995, J OPER RES SOC, V46, P896, DOI 10.2307/2583973
  • [5] Bagga P. C., 1986, INDIAN J MANAGEMENT, V2
  • [6] BIANCO L, 1988, NAV RES LOG, V35, P177, DOI 10.1002/1520-6750(198804)35:2<177::AID-NAV3220350203>3.0.CO
  • [7] 2-V
  • [8] Bitran G. R., 1990, Journal of Manufacturing and Operations Management, V3, P24
  • [9] CHU CB, 1992, NAV RES LOG, V39, P265, DOI 10.1002/1520-6750(199203)39:2<265::AID-NAV3220390209>3.0.CO
  • [10] 2-L