A decision support system for selecting the optimal contracting strategy in highway work zone projects

被引:17
作者
Bayraktar, Mehmet Emre [1 ]
Hastak, Makarand [2 ]
机构
[1] Florida Int Univ, Dept Construct Management, Miami, FL 33174 USA
[2] Purdue Univ, Div Construct Engn & Management, W Lafayette, IN 47907 USA
关键词
Highway construction; Construction management; Scheduling; Simulation; Monte Carlo method; CONSTRUCTION-SCHEDULE; MODEL; COST; RISK;
D O I
10.1016/j.autcon.2009.03.007
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Highway work zone projects are challenging for state highway agencies and contractors as they are often located in urban areas and impact local traffic, business community, and neighborhood leading to a multiparty involvement. There is a dynamic relationship between the involved parties and the performance of any highway work zone project is governed by this dynamic relationship. This paper presents a decision support system to assist state Departments of Transportation in selecting suitable contracting strategies for highway tween the stakeholders as well work zone projects by considering, at a macro level, the interrelationships be as the critical factors impacting the project. The proposed methodology supplements the current project decision-making process with regard to important project performance variables such as cost, schedule. quality, safety, and public satisfaction. (C) 2009 Elsevier B.V. All rights reserved.
引用
收藏
页码:834 / 843
页数:10
相关论文
共 27 条
  • [1] Factors affecting contractors' risk of cost overburden
    Akinci, B
    Fischer, M
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 1998, 14 (01) : 67 - 76
  • [2] Probabilistic analysis of factors affecting highway construction costs: a belief network approach
    Attoh-Okine, NO
    [J]. CANADIAN JOURNAL OF CIVIL ENGINEERING, 2002, 29 (03) : 369 - 374
  • [3] Integrated approach to total maximum daily load development for Neuse River Estuary using Bayesian probability network model (Neu-BERN)
    Borsuk, ME
    Stow, CA
    Reckhow, KH
    [J]. JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT-ASCE, 2003, 129 (04): : 271 - 282
  • [4] Construction Congestion Cost (CO3) traffic impact and construction cost
    Carr, RI
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2000, 126 (02): : 114 - 121
  • [5] COHEN HS, 245 TRANSP RES BOARD
  • [6] More-stable owner contractor relationships
    Dozzi, P
    Hartman, F
    Tidsbury, N
    Ashrafi, R
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1996, 122 (01): : 30 - 35
  • [7] Weekend closure for construction of asphalt overlay on urban highway
    Dunston, PS
    Savage, BM
    Mannering, F
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2000, 126 (04) : 313 - 319
  • [8] Benefits of small projects team initiative
    Dunston, PS
    Reed, AG
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2000, 126 (01): : 22 - 28
  • [9] Time-cost-quality trade-off analysis for highway construction
    El-Rayes, K
    Kandil, A
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2005, 131 (04) : 477 - 486
  • [10] Forkenbrock D.J., 1990, ROAD INVESTMENT FOST