共 27 条
- [3] Integrated approach to total maximum daily load development for Neuse River Estuary using Bayesian probability network model (Neu-BERN) [J]. JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT-ASCE, 2003, 129 (04): : 271 - 282
- [4] Construction Congestion Cost (CO3) traffic impact and construction cost [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2000, 126 (02): : 114 - 121
- [5] COHEN HS, 245 TRANSP RES BOARD
- [6] More-stable owner contractor relationships [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1996, 122 (01): : 30 - 35
- [8] Benefits of small projects team initiative [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2000, 126 (01): : 22 - 28
- [10] Forkenbrock D.J., 1990, ROAD INVESTMENT FOST