Prioritizing traffic-calming projects using the analytic hierarchy process

被引:10
作者
Guegan, DP
Martin, PT
Cottrell, WD
机构
[1] Fehr & Peers Associates Inc, Murray, UT 84107 USA
[2] Univ Utah, Dept Civil & Environm Engn, Salt Lake City, UT 84112 USA
来源
TRAFFIC CONTROL DEVICES, VISIBILITY, AND RAIL-HIGHWAY GRADE CROSSINGS 2000: HIGHWAY OPERATIONS, CAPACITY, AND TRAFFIC CONTROL | 2000年 / 1708期
关键词
D O I
10.3141/1708-07
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The analytic hierarchy process (AHP), a multiple-criteria decisionmaking tool, is used to prioritize traffic-calming projects. AHP is proposed as an alternative to existing point scoring systems. Prioritization methods used in traffic-calming programs in Portland, Oregon, and Canberra, Australia, are applied; the results are compared to those of AHP. The three methods apparently produce similar rankings when applied to local streets that have speeding problems. AHP produces rankings different from those of the other two methods, however, when complex issues and qualitative factors must be taken into account. AHP may be more suitable in cases in which some factors cannot be quantified. In the examples studied, these factors included traffic diversion, the importance of the street, the impacts of existing traffic-control devices and measures adjacent to elementary schools, terrain, and neighborhood residents' opinions. None of these factors could readily be assigned a value in a point scoring system. Some of the concerns in applying AHP are the tediousness of making pairwise comparisons between alternatives, the consistency of the comparisons, and the defensibility of the scores. The decision maker should examine the scores to ensure that they are sensible and should be adequately aware of the issues so as to defend the scores. If there are n alternatives, then n(n - 1)/2 pairwise comparisons are needed. Clearly, for expedient application of AHP, the alternatives must be limited to a reasonable number.
引用
收藏
页码:61 / 67
页数:7
相关论文
共 17 条
[1]  
ANDERSON DR, 1997, INTRO MANAGEMENT SCI
[2]   TRAFFIC CALMING [J].
BICKNELL, D .
PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-MUNICIPAL ENGINEER, 1993, 98 (01) :13-19
[3]  
Brindle R, 1997, ITE J, V67, P26
[4]  
*BUR TRAFF MAN OFF, 1998, TRAFF CALM PROGR
[5]  
CATALANO V, 1997, P C URB TRANSP DIV A, P21
[6]  
Dissanayake S, 1999, ITE J, V69, P28
[7]  
Ewing R, 1997, ITE J, V67, P28
[8]  
EWING R, 1998, TRAFFIC CALMING STAT
[10]  
GUEGAN DP, 1999, THESIS U UTAH SALT L