The two-stage assembly scheduling problem to minimize total completion time with setup times

被引:64
作者
Allahverdi, Ali [1 ]
Al-Anzi, Fawaz S. [2 ]
机构
[1] Kuwait Univ, Dept Ind & Management Syst Engn, Safat, Kuwait
[2] Kuwait Univ, Dept Comp Engn, Safat, Kuwait
关键词
Scheduling; Assembly flowshop; Total completion time; Heuristic; Dominance relation; BOUND ALGORITHM; HEURISTICS; 3-MACHINE; MAKESPAN; SEARCH; SHOPS; MODEL;
D O I
10.1016/j.cor.2008.12.001
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
We address the two-stage assembly scheduling problem where there are m machines at the first stage and an assembly machine at the second stage. The objective is to schedule the available n jobs so that total completion time of all n jobs is minimized. Setup times are treated as separate from processing times. This problem is NP-hard, and therefore we present a dominance relation and propose three heuristics. The heuristics are evaluated based on randomly generated data. One of the proposed heuristics is known to be the best heuristic for the case of zero setup times while another heuristic is known to perform well for such problems. A new version of the latter heuristic, which utilizes the dominance relation, is proposed and shown to perform much better than the other two heuristics. (C) 2008 Elsevier Ltd. All rights reserved.
引用
收藏
页码:2740 / 2747
页数:8
相关论文
共 26 条
[1]  
Al-Anzi F. S., 2006, International Journal of Operations Research, V3, P109
[2]   A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times [J].
Al-Anzi, Fawaz S. ;
Allahverdi, Ali .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 182 (01) :80-94
[3]   A PSO and a Tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application [J].
Allahverdi, A ;
Al-Anzi, FS .
COMPUTERS & OPERATIONS RESEARCH, 2006, 33 (04) :1056-1080
[4]   A review of scheduling research involving setup considerations [J].
Allahverdi, A ;
Gupta, JND ;
Aldowaisan, T .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1999, 27 (02) :219-239
[5]   A survey of scheduling problems with setup times or costs [J].
Allahverdi, Ali ;
Ng, C. T. ;
Cheng, T. C. E. ;
Kovalyov, Mikhail Y. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 187 (03) :985-1032
[6]   The significance of reducing setup times/setup costs [J].
Allahverdi, Ali ;
Soroush, H. M. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 187 (03) :978-984
[7]   Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times [J].
Allahverdi, Ali ;
Al-Anzi, Fawaz S. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2006, 44 (22) :4713-4735
[8]   Operating theatre scheduling using Lagrangian relaxation [J].
Augusto, V. ;
Xie, X. ;
Perdomo, V. .
EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2008, 2 (02) :172-189
[9]  
Ben Hmida A, 2007, EUR J IND ENG, V1, P223, DOI 10.1504/EJIE.2007.014110
[10]   Metaheuristics for solving economic lot scheduling problems (ELSP) using time-varying lot-sizes approach [J].
Chandrasekaran, C. ;
Rajendran, Chandrasekharan ;
Chetty, O. V. Krishnaiah ;
Hanumanna, Donakonda .
EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2007, 1 (02) :152-181