The dynamic relocation and phase-out of a hybrid, two-echelon plant/warehousing facility: A multiple objective approach

被引:79
作者
Melachrinoudis, E
Min, H
机构
[1] Univ Louisville, Logist & Distribut Inst, Speech Res Adm, Louisville, KY 40292 USA
[2] Northeastern Univ, Dept Mech Ind & Mfg Engn, Boston, MA 02115 USA
关键词
dynamic location; supply chain management; multiple objective programming;
D O I
10.1016/S0377-2217(99)00166-6
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
A real-world application involving the relocation and phase-out of a combined manufacturing plant and warehousing facility is presented in this paper. The relocation and phase-out decision was called for to adapt to dynamic changes in business environments surrounding the firm's supply chain operations. Such changes include changes in supplier and customer bases, distribution networks, corporate re-engineering, business climate, and government legislation. To aid management in formulating more effective relocation strategy, we assess the viability of the proposed site from multi-echelon supply chain perspectives and determine the optimal timing of relocation and phase-out in the multiple planning horizon using a dynamic, multiple objective, mixed-integer programming model. (C) 2000 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:1 / 15
页数:15
相关论文
共 32 条
[31]   AN OVERVIEW OF THE ANALYTIC HIERARCHY PROCESS AND ITS APPLICATIONS [J].
VARGAS, LG .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1990, 48 (01) :2-8
[32]  
VENABLE T, 1996, SITE SELECT, V41, P436