摘要
We address the single-machine batch scheduling problem which arises when there are job families and setup requirements exist between these families; our objective is to minimize the maximum lateness. As our main result, we give an improved dynamic program for the solution of the problem. (C) 1997 Elsevier Science B.V.
引用
收藏
页码:77 / 80
页数:4
相关论文
共 13 条
[1]  
[Anonymous], 1979, Computers and Intractablity: A Guide to the Theoryof NP-Completeness
[2]  
BAKER KR, 1994, ORSA TIMS M DETR
[3]  
Bruno J., 1978, Foundations of Control Engineering, V3, P105
[4]  
BRUNO J, 1978, SIAM J COMPUT, V7, P393, DOI 10.1137/0207031
[5]   BATCH SCHEDULING TO MINIMIZE TOTAL COMPLETION-TIME [J].
GHOSH, JB .
OPERATIONS RESEARCH LETTERS, 1994, 16 (05) :271-275
[6]   ON THE COMPLEXITY OF SCHEDULING WITH BATCH SETUP TIMES [J].
MONMA, CL ;
POTTS, CN .
OPERATIONS RESEARCH, 1989, 37 (05) :798-804
[7]   INTEGRATING SCHEDULING WITH BATCHING AND LOT-SIZING - A REVIEW OF ALGORITHMS AND COMPLEXITY [J].
POTTS, CN ;
VANWASSENHOVE, LN .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1992, 43 (05) :395-406
[8]   SCHEDULING 2 JOB CLASSES ON A SINGLE-MACHINE [J].
POTTS, CN .
COMPUTERS & OPERATIONS RESEARCH, 1991, 18 (05) :411-415
[9]   Single-machine scheduling with release dates, due dates and family setup times [J].
Schutten, JMJ ;
vandeVelde, SL ;
Zijm, WHM .
MANAGEMENT SCIENCE, 1996, 42 (08) :1165-1174
[10]   BATCH SEQUENCING [J].
UNAL, AT ;
KIRAN, AS .
IIE TRANSACTIONS, 1992, 24 (04) :73-83