Optimal production run length for products sold with warranty

被引:75
作者
Yeh, RH
Ho, WT
Tseng, ST
机构
[1] Natl Taiwan Univ Sci & Technol, Dept Ind Management, Taipei, Taiwan
[2] Natl Tsing Hua Univ, Inst Stat, Hsinchu, Taiwan
关键词
production; continuous-time Markov chain; deteriorating system; warranty;
D O I
10.1016/S0377-2217(99)00004-1
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This article studies the optimal production run length for a deteriorating production system in which the products are sold with free minimal repair warranty. The deterioration process of the system is characterized by a two-state continuous-time Markov chain. For products sold with free minimal repair warranty, we show that there exists a unique optimal production run length such that the expected total cost per item is minimized. Since there is no closed form expression for the optimal production run length, an approximate solution is derived. In addition, three special cases which provide bounds for searching the optimal production run length are investigated and some sensitivity analysis is carried out to study the effects of the model parameters on the optimal production run length. Finally, a numerical example is given to evaluate the performance of the optimal production run length. (C) 2000 Elsevier Science B,V. All rights reserved.
引用
收藏
页码:575 / 582
页数:8
相关论文
共 14 条
[1]   PRODUCT WARRANTY MANAGEMENT .1. A TAXONOMY FOR WARRANTY POLICIES [J].
BLISCHKE, WR ;
MURTHY, DNP .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1992, 62 (02) :127-148
[2]   QUALITY-CONTROL THROUGH LOT-SIZING FOR ITEMS SOLD WITH WARRANTY [J].
DJAMALUDIN, I ;
MURTHY, DNP ;
WILSON, RJ .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1994, 33 (1-3) :97-107
[3]  
JOHNSON LA, 1980, OPERATIONS RES PRODU
[4]   An extended EMQ model for a failure prone machine with general lifetime distribution [J].
Kim, CH ;
Hong, YS .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1997, 49 (03) :215-223
[5]   A PRODUCTION AND MAINTENANCE PLANNING-MODEL WITH RESTORATION COST DEPENDENT ON DETECTION DELAY [J].
LEE, HL ;
ROSENBLATT, MJ .
IIE TRANSACTIONS, 1989, 21 (04) :368-375
[6]   SIMULTANEOUS DETERMINATION OF PRODUCTION CYCLE AND INSPECTION SCHEDULES IN A PRODUCTION SYSTEM [J].
LEE, HL ;
ROSENBLATT, MJ .
MANAGEMENT SCIENCE, 1987, 33 (09) :1125-1136
[8]  
Murthy D. N. P., 1993, Quality and Reliability Engineering International, V9, P431, DOI 10.1002/qre.4680090507
[9]  
Murthy D.N.P., 1990, ENG OPTIMIZ, V15, P281, DOI DOI 10.1080/03052159008941158
[10]   PRODUCT WARRANTY MANAGEMENT .3. A REVIEW OF MATHEMATICAL-MODELS [J].
MURTHY, DNP ;
BLISCHKE, WR .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1992, 63 (01) :1-34