Tritium retention and clean-up in JET

被引:143
作者
Andrew, P
Brennan, PD
Coad, JP
Ehrenberg, J
Gadeberg, M
Gibson, A
Hillis, DL
How, J
Jarvis, ON
Jensen, H
Lässer, R
Marcus, F
Monk, R
Morgan, P
Orchard, J
Peacock, A
Pearce, R
Pick, M
Rossi, A
Schild, P
Schunke, B
Stork, D
机构
[1] Jet Joint Undertaking, Abingdon OX14 3EA, Oxon, England
[2] Oak Ridge Natl Lab, Oak Ridge, TN 37831 USA
关键词
JET; torus; tritium retention;
D O I
10.1016/S0920-3796(99)00084-8
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
During 1997 JET operation with D-T plasmas, 35 g of tritium were introduced into the torus, mainly by gas puffing. It was found that during this period, the torus tritium inventory would accumulate at a rate of about 40% of the input. After tritium operation ceased,;he experimental program continued with deuterium- and hydrogen-fuelled experiments, during which time the tritium inventory decreased to about 17% of the total input. Techniques aimed at detritiation of the torus included methods using deuterium gas (such as deuterium pulsing) which were used in the middle of the experimental campaign, and methods which could adversely affect the torus vacuum conditions (such as air purges) which were reserved for the period after the experimental campaign. Whilst it was found that the plasma tritium fraction could be reduced to below the 1% level in a few days, the tritium inventory reached a virtually steady level of about 6 g by the end of the campaign. (C) 1999 JET Joint Undertaking. Published by Elsevier Science S.A. All rights reserved.
引用
收藏
页码:233 / 245
页数:13
相关论文
共 38 条
  • [21] Chemical erosion of pyrolytic graphite by low-energy H+ and D+ impact
    Mech, BV
    Haasz, AA
    Davis, JW
    [J]. JOURNAL OF NUCLEAR MATERIALS, 1997, 241 : 1147 - 1151
  • [22] MUELLER D, 1997, P 17 IEEE NPSS S FUS, P279
  • [23] Tritium inventory issues for future reactors: choices, parameters, limits
    Murdoch, DK
    Day, C
    Gierszewski, P
    Penzhorn, RD
    Wu, CH
    [J]. FUSION ENGINEERING AND DESIGN, 1999, 46 (2-4) : 255 - 271
  • [24] OBERT W, 1995, P 16 IEEE NPSS S FUS, V1, P742
  • [25] IMPURITY COVERAGE AND DEUTERIUM INVENTORY OF BERYLLIUM AND CARBON 1ST WALL COMPONENTS AFTER BERYLLIUM OPERATION IN JET
    PEACOCK, AT
    COAD, JP
    LAMA, F
    BEHRISCH, R
    MARTINELLI, AP
    MILLS, BE
    PICK, M
    PARTRIDGE, J
    SIMPSON, JCB
    ZHU, YK
    [J]. JOURNAL OF NUCLEAR MATERIALS, 1990, 176 : 326 - 331
  • [26] PEACOCK AT, 1998, IN PRESS J NUCL MAT, P65
  • [27] PHILLIPS V, COMMUNICATION
  • [28] A report on the first remote handling operations at JET
    Rolfe, AC
    Brown, P
    Carter, P
    Cusack, R
    Gaberscik, A
    Galbiati, L
    Haist, B
    Horn, R
    Irving, M
    Locke, D
    Loving, A
    Martin, P
    Mills, S
    Minchin, R
    Palmer, J
    Sanders, S
    Sanders, SG
    Stokes, R
    [J]. FUSION ENGINEERING AND DESIGN, 1999, 46 (2-4) : 299 - 306
  • [29] DEUTERIUM RELEASE MEASUREMENTS IN THE BERYLLIUM PHASE OF JET AND DETERMINATION OF TRITIUM CONTENT IN THE EXHAUST-GAS
    SARTORI, R
    SAIBENE, G
    GOODALL, DHJ
    USSELMANN, E
    COAD, P
    HOLLAND, D
    [J]. JOURNAL OF NUCLEAR MATERIALS, 1990, 176 : 624 - 629
  • [30] SARTORI R, 1990, J NUCL MAT, V177