Distributed multiproject resource control: A market-based approach

被引:9
作者
Kumara, SRT [1 ]
Lee, YH
Chatterjee, K
机构
[1] Penn State Univ, Dept Ind & Mfg Engn, Lab Intelligent Syst & Qual, University Pk, PA 16802 USA
[2] Penn State Univ, Dept Management Sci, University Pk, PA 16802 USA
[3] Penn State Univ, Dept Econ, University Pk, PA 16802 USA
来源
CIRP ANNALS-MANUFACTURING TECHNOLOGY | 2002年 / 51卷 / 01期
关键词
dynamic scheduling; distributed project management; project control;
D O I
10.1016/S0007-8506(07)61538-8
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The multiple project resource-scheduling problems extend job-shop scheduling problems by allowing for task dependency and multiple entities trying to maximize their own requirements fulfillment. In this paper we deal with decentralized scheduling of resources, which are shared by multiple projects. In specific, we address the dynamic nature of the situation. We model this as a virtual economy (entities as buyers and sellers of resources), where the "resource-time slots" (resource availability over a given time) are traded as goods. Due to the dynamic and distributed nature of the economy, through our approach we achieve higher levels of flexibility and scalability. In this paper, we discuss our virtual economy model and the market mechanism along with empirical analysis and results.
引用
收藏
页码:367 / 370
页数:4
相关论文
共 10 条
[1]  
Clearwater S. H., 1996, MARKET BASED CONTROL
[2]  
KOLISCH R, 1996, 396 U KIEL I BETR
[3]  
LEE YH, 2001, WORLD C ROCH NY SEPT
[4]  
LUI F, 1998, ANN CIRP, V47, P111
[5]  
Markus A, 1996, CIRP Annals-Manufacturing Technology, V45, P433, DOI DOI 10.1016/S0007-8506
[6]   A COMPARISON OF EXACT APPROACHES FOR SOLVING THE MULTIPLE CONSTRAINED RESOURCE, PROJECT SCHEDULING PROBLEM [J].
PATTERSON, JH .
MANAGEMENT SCIENCE, 1984, 30 (07) :854-867
[7]  
PETRIE CJ, 1998, PROCESS COORDINATION
[8]  
Varian HR, 1992, MICROECONOMIC ANAL
[9]  
VRIES S, 2000, COMBINATORIAL AUCTIO
[10]  
[No title captured]