Generating Pareto schedules with outsource and internal parallel resources

被引:22
作者
Ruiz-Torres, Alex J. [1 ]
Ho, Johnny C. [1 ]
Lopez, Francisco J. [1 ]
机构
[1] Univ Texas, Dept Informat & Decis Sci, El Paso, TX 79968 USA
关键词
scheduling; supply chain scheduling; outsourcing; Pareto solutions; multi-criteria; number of late jobs; parallel machines; machine utilization;
D O I
10.1016/j.ijpe.2005.11.010
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The outsourcing of manufacturing operations continues to gain popularity, forcing companies to deal with the issue of scheduling orders in increasingly complex supply chains. This paper addresses a supply chain scheduling problem where both internal and external/outsourced parallel resources are available and the objectives are to minimize the number of late orders and the total outsource machine time. Both criteria are significant since the former is a measure of the degree of customer service while the latter represents an important cost measure. Several heuristics are developed that generate sets of Pareto-efficient schedules. The bi-criteria performance of the heuristics is assessed employing three existing methods for evaluating efficient solution sets. The evaluation (comparison of the heuristics) is based on two experiments where the values of relevant parameters (e.g., due date tightness or number of jobs) are set at different levels. These performance evaluations and comparisons between heuristics show that various approaches work well, each dominating under particular conditions of experimental variables. (c) 2006 Elsevier B.V. All rights reserved.
引用
收藏
页码:810 / 825
页数:16
相关论文
共 25 条
[1]   A Brownian approximation of a production-inventory system with a manufacturer that subcontracts [J].
Bradley, JR .
OPERATIONS RESEARCH, 2004, 52 (05) :765-784
[2]   Quantitative comparison of approximate solution sets for bi-criteria optimization problems [J].
Carlyle, WM ;
Fowler, JW ;
Gel, ES ;
Kim, B .
DECISION SCIENCES, 2003, 34 (01) :63-82
[3]   COMPLEXITY OF SINGLE-MACHINE, MULTICRITERIA SCHEDULING PROBLEMS [J].
CHEN, CL ;
BULFIN, RL .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1993, 70 (01) :115-125
[4]  
Choi HR, 2004, LECT NOTES COMPUT SC, V3029, P249
[5]   Capacity allocation and outsourcing in a process industry [J].
de Kok, TG .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2000, 68 (03) :229-239
[6]  
Deprins D, 1984, PERFORMANCE PUBLIC E
[7]   A SIMULATED ANNEALING HEURISTIC FOR SCHEDULING IN A FLOWSHOP WITH BICRITERIA [J].
GANGADHARAN, R ;
RAJENDRAN, C .
COMPUTERS & INDUSTRIAL ENGINEERING, 1994, 27 (1-4) :473-476
[8]   Generating efficient schedules for identical parallel machines involving flow-time and tardy jobs [J].
Gupta, JND ;
Ruiz-Torres, AJ .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 167 (03) :679-695
[9]   MINIMIZING THE NUMBER OF TARDY JOBS FOR M-PARALLEL MACHINES [J].
HO, JC ;
CHANG, YL .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1995, 84 (02) :343-355
[10]   An expert system for evaluating the make or buy decision [J].
Humphreys, P ;
McIvor, R ;
Huang, G .
COMPUTERS & INDUSTRIAL ENGINEERING, 2002, 42 (2-4) :567-585