Optimal manufacturing batch size with rework process at a single-stage production system

被引:193
作者
Jamal, AMM
Sarker, BR [1 ]
Mondal, S
机构
[1] Louisiana State Univ, Dept Ind & Mfg Syst Engn, Baton Rouge, LA 70803 USA
[2] SE Louisiana Univ, Dept Management, Hammond, LA 70402 USA
关键词
rework; single and multiple cycles; manufacturing batches; sensitivity analysis;
D O I
10.1016/j.cie.2004.03.001
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Determining an optimal batch quantity in a production system that produces defective items has been the primary focus recently among the researchers. While most of the work has been reported to explore the traditional optimal inventory level in ideal cases, little appears to have been done with rework option. In this paper, models have been developed to determine the optimum batch quantity in a single-stage system in which rework is done under two different operational policies to minimize the total system cost. The first policy deals with rework being completed within the same cycle. The second policy deals with the rework being done after N cycles causing less than the desired quantity of good products in each cycle. The models have been validated with illustrating numerical examples and the sensitivity of optimal batch size and total system cost with respect to the defective proportion have also been performed. (C) 2004 Elsevier Ltd. All rights reserved.
引用
收藏
页码:77 / 89
页数:13
相关论文
共 13 条
[1]  
[Anonymous], IIE T
[2]  
Chakraborty S., 1988, Opsearch, V25, P75
[3]  
Goyal S. K., 1990, International Journal of Operations & Production Management, V10, P69, DOI 10.1108/01443579010138897
[4]   LOOPING IN A MULTISTAGE PRODUCTION SYSTEM [J].
GUPTA, T ;
CHAKRABORTY, S .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1984, 22 (02) :299-311
[5]   Production lot sizing with the reworking of imperfect quality items produced [J].
Hayek, PA ;
Salameh, MK .
PRODUCTION PLANNING & CONTROL, 2001, 12 (06) :584-590
[6]   Optimal batch size and investment in multistage production systems with scrap [J].
Lee, HH ;
Chandra, MJ ;
Deleveaux, VJ .
PRODUCTION PLANNING & CONTROL, 1997, 8 (06) :586-596
[8]   Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs [J].
Liu, JJ ;
Yang, P .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 91 (03) :517-527
[9]   Optimal control of production and remanufacturing in a simple recovery model with linear cost functions Optimale Kontrolle von Produktion und Aufarbeitung in einem einfachen Lagerhaltungsmodell der Kreislaufwirtschaft mit linearer Kostenstruktur [J].
Stefan Minner ;
Rainer Kleber .
OR-Spektrum, 2001, 23 (1) :3-24
[10]   The reverse Wagner/Whitin model with variable manufacturing and remanufacturing cost [J].
Richter, K ;
Weber, J .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2001, 71 (1-3) :447-456