Coordination of production and interstage batch delivery with outsourced distribution

被引:57
作者
Agnetis, Alessandro [1 ]
Aloulou, Mohamed Ali [2 ,3 ]
Fu, Liang-Liang [2 ,3 ]
机构
[1] Univ Siena, I-53100 Siena, Italy
[2] Univ Paris 09, PSL, F-75775 Paris 16, France
[3] CNRS, LAMSADE UMR 7243, F-75700 Paris, France
关键词
Supply chain scheduling; Batching and delivery; Outsourced distribution; Two delivery modes; Dynamic programming; SUPPLY CHAIN; DISTRIBUTION-SYSTEMS; AIR-TRANSPORTATION; OPERATIONS; TARDINESS;
D O I
10.1016/j.ejor.2014.03.039
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper, we consider coordinated production and interstage batch delivery scheduling problems, where a third-party logistics provider (3PP) delivers semi-finished products in batches from one production location to another production location belonging to the same manufacturer. A batch cannot be delivered until all jobs of the batch are completed at the upstream stage. The 3PP is required to deliver each product within a time T from its release at the upstream stage. We consider two transportation modes: regular transportation, for which delivery departure times are fixed at the beginning, and express transportation, for which delivery departure times are flexible. We analyze the problems faced by the 3PP when either the manufacturer dominates or the 3PP dominates. In this context, we investigate the complexity of several problems, providing polynomiality and NP-completeness results. (C) 2014 Elsevier B.V. All rights reserved.
引用
收藏
页码:130 / 142
页数:13
相关论文
共 30 条
[1]   Supply chain scheduling: Sequence coordination [J].
Agnetis, Alessandro ;
Hall, Nicholas G. ;
Pacciarelli, Dario .
DISCRETE APPLIED MATHEMATICS, 2006, 154 (15) :2044-2063
[2]   A bicriteria two-machine flow-shop serial-batching scheduling problem with bounded batch size [J].
Aloulou, M. A. ;
Bouzaiene, A. ;
Dridi, N. ;
Vanderpooten, D. .
JOURNAL OF SCHEDULING, 2014, 17 (01) :17-29
[3]  
[Anonymous], 1979, Computers and Intractablity: A Guide to the Theory of NP-Completeness
[4]   Semi-online two-level supply chain scheduling problems [J].
Averbakh, Igor ;
Baysan, Mehmet .
JOURNAL OF SCHEDULING, 2012, 15 (03) :381-390
[5]   Coordination of Outsourced Operations to Minimize Weighted Flow Time and Capacity Booking Costs [J].
Aydinliyim, Tolga ;
Vairaktarakis, George L. .
M&SOM-MANUFACTURING & SERVICE OPERATIONS MANAGEMENT, 2010, 12 (02) :236-255
[6]   Coordination of Outsourced Operations at a Third-Party Facility Subject to Booking, Overtime, and Tardiness Costs [J].
Cai, Xiaoqiang ;
Vairaktarakis, George L. .
OPERATIONS RESEARCH, 2012, 60 (06) :1436-1450
[7]   Supply chain scheduling: Conflict and cooperation in assembly systems [J].
Chen, Zhi-Long ;
Hall, Nicholas G. .
OPERATIONS RESEARCH, 2007, 55 (06) :1072-1089
[8]   Integrated Production and Outbound Distribution Scheduling: Review and Extensions [J].
Chen, Zhi-Long .
OPERATIONS RESEARCH, 2010, 58 (01) :130-148
[9]   Integrated scheduling of production and distribution operations [J].
Chen, ZL ;
Vairaktarakis, GL .
MANAGEMENT SCIENCE, 2005, 51 (04) :614-628
[10]  
Dawande M, 2006, PROD OPER MANAG, V15, P243, DOI 10.1111/j.1937-5956.2006.tb00243.x