Minimizing makespan on a batch-processing machine with non-identical job sizes using genetic algorithms

被引:167
作者
Damodaran, Purushothaman [1 ]
Manjeshwar, Praveen Kumar [1 ]
Srihari, Krishnaswami [1 ]
机构
[1] SUNY Binghamton, Dept Syst Sci & Ind Engn, Elect Mfg Res & Serv, Binghamton, NY 13902 USA
关键词
heuristics; batch-processing machines; scheduling; genetic algorithms;
D O I
10.1016/j.ijpe.2006.02.010
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper aims at minimizing the makespan for a batch-processing machine. The processing times and the sizes of the jobs are known. The machine can process a batch as long as its capacity is not exceeded. The processing time of a batch is the longest processing time of all the jobs in that batch. This problem is NP-hard and hence a genetic algorithm (GA) approach is proposed. Random instances were used to test the effectiveness of the proposed approach. The results obtained from GA were compared with a simulated annealing approach and a commercial solver. The results indicate that the GA was able to arrive at better makespan with shorter run times. (c) 2006 Elsevier B.V. All rights reserved.
引用
收藏
页码:882 / 891
页数:10
相关论文
共 23 条
[21]  
Uzsoy R., 1997, Production and Operations Management, V6, P57, DOI 10.1111/j.1937-5956.1997.tb00415.x
[23]   A genetic algorithm to minimize maximum lateness on a batch processing machine [J].
Wang, CS ;
Uzsoy, R .
COMPUTERS & OPERATIONS RESEARCH, 2002, 29 (12) :1621-1640