Optimal response of a power generator to energy, AGC, and reserve pool-based markets

被引:67
作者
Arroyo, JM [1 ]
Conejo, AJ [1 ]
机构
[1] Univ Castilla La Mancha, Dept Ingn Elect Elect & automat, ETSI Ind, E-13071 Ciudad Real, Spain
关键词
AGC market; energy market; mixed-integer optimization; pool-based electricity markets; reserve market;
D O I
10.1109/TPWRS.2002.1007910
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The electric power industry all over the world is undertaking major regulatory and operational changes. The understanding of power supply as a public service is being replaced by the notion that competitive markets constitute a more appropriate framework to supply reliable and cheap electric energy to consumers. As mandated by FERC orders 888 and 889, this paper considers simultaneously energy, AGC, and reserve markets in a pool framework. It provides a tool to enable a power generator to determine optimally its degree of involvement in each one of these markets. A real-world case study is analyzed and results are presented.
引用
收藏
页码:404 / 410
页数:7
相关论文
共 15 条
  • [1] [Anonymous], 1996, PROM WHOL COMP OP AC
  • [2] [Anonymous], 2000, GAMS CPLEX 7 0 USER
  • [3] Optimal response of a thermal unit to an electricity spot market
    Arroyo, JM
    Conejo, AJ
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2000, 15 (03) : 1098 - 1104
  • [4] Forecasting energy prices in a competitive market
    Bastian, J
    Zhu, JX
    Banunarayanan, V
    Mukerji, R
    [J]. IEEE COMPUTER APPLICATIONS IN POWER, 1999, 12 (03): : 40 - 45
  • [5] Energy and ancillary service dispatch for the interim ISO New England Electricity Market
    Cheung, KW
    Shamsollahi, P
    Sun, D
    Milligan, J
    Potishnak, M
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2000, 15 (03) : 968 - 974
  • [6] INTEGER PROGRAMMING APPROACH TO THE PROBLEM OF OPTIMAL UNIT COMMITMENT WITH PROBABILISTIC RESERVE DETERMINATION
    DILLON, TS
    EDWIN, KW
    KOCHS, HD
    TAUD, RJ
    [J]. IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1978, 97 (06): : 2154 - 2166
  • [7] *FERC, 1996, OP ACC SAM TIM INF S
  • [8] Generation scheduling in a deregulated system. The Norwegian case - Discussion
    Fotuhi-Firuzabad, M
    Billinton, R
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 1999, 14 (01) : 81 - 81
  • [9] KORENEFF G, 1998, P INT C EN MAN POW D, V1, P223
  • [10] NOGALES FJ, 2001, IEEE T POWER SYS NOV