A fuzzy logic based production scheduling/rescheduling in the presence of uncertain disruptions

被引:70
作者
Petrovic, D. [1 ]
Duenas, Alejandra [1 ]
机构
[1] Coventry Univ, Sch Math & Informat Sci, Coventry CV1 5FB, W Midlands, England
基金
英国工程与自然科学研究理事会;
关键词
fuzzy inference systems; level 2 fuzzy sets; predictive scheduling; rescheduling; genetic algorithms;
D O I
10.1016/j.fss.2006.04.009
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
In this paper, a new fuzzy logic based decision support system for parallel machine scheduling/rescheduling in the presence of uncertain disruptions is presented. It is applied to a real-life problem identified in a pottery company. The uncertain disruption considered is glaze shortage, defined by two parameters: number of glaze shortage occurrences and glaze shortage duration. Both parameters are specified imprecisely. They are modelled and combined using standard fuzzy sets and level 2 fuzzy sets, respectively. In order to deal with the glaze shortage disruption, a predictive-reactive scheduling approach is proposed and implemented. It is defined as a two-step procedure. In the first step, a predictive schedule is generated in such a way as to being capable of absorbing the impact of the glaze shortage disruption. In the second step, rescheduling is applied when the impact of the glaze shortage disruption is too high. Two sets of Sugeno type rules are proposed to support rescheduling decision making. One set of the fuzzy rules determines when to reschedule, whilst the other one determines which rescheduling method to use. Various tests are carried out that show that (1) the predictive schedules have good performance in the presence of uncertain disruptions and (2) the fuzzy inference generates appropriate rescheduling decisions. (C) 2006 Elsevier B.V. All rights reserved.
引用
收藏
页码:2273 / 2285
页数:13
相关论文
共 31 条
[1]   Rescheduling job shops under random disruptions [J].
Abumaizar, RJ ;
Svestka, JA .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1997, 35 (07) :2065-2082
[2]   A fuzzy-linguistic approach to a multi-criteria sequencing problem [J].
Adamopoulos, GI ;
Pappis, CP .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 92 (03) :628-636
[3]  
[Anonymous], SCHEDULING FUZZINESS
[4]   Executing production schedules in the face of uncertainties: A review and some future directions [J].
Aytug, H ;
Lawley, MA ;
McKay, K ;
Mohan, S ;
Uzsoy, R .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 161 (01) :86-110
[5]   Implementing global factory schedules in the face of stochastic disruptions [J].
Barua, A ;
Raghavan, N ;
Upasani, A ;
Uzsoy, R .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2005, 43 (04) :793-818
[6]   Modelling of job-shop scheduling with multiple quantitative and qualitative objectives and a GA/TS mixture approach [J].
Chang, PT ;
Lo, YT .
INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 2001, 14 (04) :367-384
[7]   ANALYSIS OF PERIODIC AND EVENT-DRIVEN RESCHEDULING POLICIES IN DYNAMIC SHOPS [J].
CHURCH, LK ;
UZSOY, R .
INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 1992, 5 (03) :153-163
[8]  
Duenas A, 2005, LECT NOTES ARTIF INT, V3789, P234
[9]   DISPATCHING RULES IN SCHEDULING - A FUZZY APPROACH [J].
GRABOT, B ;
GENESTE, L .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1994, 32 (04) :903-915
[10]   Rescheduling for new orders [J].
Hall, NG ;
Potts, CN .
OPERATIONS RESEARCH, 2004, 52 (03) :440-453