Chance-constrained programming models for capital budgeting with NPV as fuzzy parameters

被引:55
作者
Huang, Xiaoxia [1 ]
机构
[1] Univ Sci & Technol Beijing, Sch Management, Beijing 100083, Peoples R China
关键词
capital budgeting; fuzzy programming; chance-constrained programming; NPV;
D O I
10.1016/j.cam.2005.11.026
中图分类号
O29 [应用数学];
学科分类号
070104 ;
摘要
In an uncertain economic environment, experts' knowledge about outlays and cash inflows of available projects consists of much vagueness instead of randomness. Investment outlays and annual net cash flows of a project are usually predicted by using experts' knowledge. Fuzzy variables can overcome the difficulties in predicting these parameters. In this paper, capital budgeting problem with fuzzy investment outlays and fuzzy annual net cash flows is studied based on credibility measure. Net present value (NPV) method is employed, and two fuzzy chance-constrained programming models for capital budgeting problem are provided. A fuzzy simulation-based genetic algorithm is provided for solving the proposed model problems. Two numerical examples are also presented to illustrate the modelling idea and the effectiveness of the proposed algorithm. (c) 2005 Elsevier B.V. All rights reserved.
引用
收藏
页码:149 / 159
页数:11
相关论文
共 37 条
[21]  
Liu B., 2004, Uncertainty Theory
[22]   Chance constrained programming with fuzzy parameters [J].
Liu, BD ;
Iwamura, K .
FUZZY SETS AND SYSTEMS, 1998, 94 (02) :227-237
[23]   Minimax chance constrained programming models for fuzzy decision systems [J].
Liu, BD .
INFORMATION SCIENCES, 1998, 112 (1-4) :25-38
[24]   Expected value of fuzzy variable and fuzzy expected value models [J].
Liu, BD ;
Liu, YK .
IEEE TRANSACTIONS ON FUZZY SYSTEMS, 2002, 10 (04) :445-450
[25]   Fuzzy programming with recourse [J].
Liu, YK .
INTERNATIONAL JOURNAL OF UNCERTAINTY FUZZINESS AND KNOWLEDGE-BASED SYSTEMS, 2005, 13 (04) :381-413
[26]   Optimal project selection when borrowing and lending rates differ [J].
Padberg, M ;
Wilczak, MJ .
MATHEMATICAL AND COMPUTER MODELLING, 1999, 29 (03) :63-78
[27]   Parallel machine scheduling models with fuzzy processing times [J].
Peng, J ;
Liu, BD .
INFORMATION SCIENCES, 2004, 166 (1-4) :49-66
[28]   A general form for the capital projects sequencing problem [J].
Taylor, RG .
COMPUTERS & INDUSTRIAL ENGINEERING, 1997, 33 (1-2) :47-50
[29]  
Weingartner H.M., 1966, J IND ECON, V11, P65
[30]   On inequalities and critical values of fuzzy random variables [J].
Yang, LX ;
Liu, BD .
INTERNATIONAL JOURNAL OF UNCERTAINTY FUZZINESS AND KNOWLEDGE-BASED SYSTEMS, 2005, 13 (02) :163-175