Using genetic algorithms to solve construction time-cost trade-off problems

被引:316
作者
Feng, CW [1 ]
Liu, LA [1 ]
Burns, SA [1 ]
机构
[1] UNIV ILLINOIS, DEPT GEN ENGN, URBANA, IL 61801 USA
关键词
D O I
10.1061/(ASCE)0887-3801(1997)11:3(184)
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Time-cost trade-off analysis is one of the most important aspects of construction project planning and control. There are trade-offs between time and cost to complete the activities of a project; in general, the less expensive the resources used, the longer it takes to complete an activity. Using critical path method (CPM), the overall project cost can be reduced by using less expensive resources for noncritical activities without impacting the project duration. Existing methods for time-cost trade-off analysis focus on using heuristics or mathematical programming. These methods, however, are not efficient enough to solve large-scale CPM networks (hundreds of activities or more). Analogous to natural selection and genetics in reproduction, genetic algorithms (GAs) have been successfully adopted to solve many science and engineering problems and have proven to be an efficient means for searching optimal solutions in a large problem domain, This paper presents: (1) an algorithm based on the principles of GAs for construction time-cost trade-off optimization; and (2) a computer program that can execute the algorithm efficiently.
引用
收藏
页码:184 / 189
页数:6
相关论文
共 22 条
[11]  
HENDERICKSON C, 1989, PROJECT MANAGEMENT C
[12]  
Holland J. H., 1975, Adaptation in natural and artificial system, DOI DOI 10.7551/MITPRESS/1090.001.0001
[13]   CRITICAL-PATH PLANNING AND SCHEDULING - MATHEMATICAL BASIS [J].
KELLEY, JE .
OPERATIONS RESEARCH, 1961, 9 (03) :296-320
[14]  
MEYER WL, 1963, CIV ENG CONSTR RES S, V2
[15]   SCHEDULE COMPRESSION USING THE DIRECT STIFFNESS METHOD [J].
MOSELHI, O .
CANADIAN JOURNAL OF CIVIL ENGINEERING, 1993, 20 (01) :65-72
[16]  
PAGNONI A, 1990, PROJECT ENG COMPUTER
[17]   HORIZON-VARYING, ZERO-ONE APPROACH TO PROJECT SCHEDULING [J].
PATTERSON, JH ;
HUBER, WD .
MANAGEMENT SCIENCE SERIES B-APPLICATION, 1974, 20 (06) :990-998
[18]   A STRUCTURAL METHOD OF COMPUTING PROJECT COST POLYGONS [J].
PRAGER, W .
MANAGEMENT SCIENCE, 1963, 9 (03) :394-404
[19]  
ROBINSON DR, 1975, MANAGE SCI, V22, P158, DOI 10.1287/mnsc.22.2.158
[20]  
SIEMENS N, 1971, MANAGE SCI B-APPL, V17, pB354