Scheduling with agreeable release times and due dates on a batch processing machine

被引:89
作者
Li, CL [1 ]
Lee, CY [1 ]
机构
[1] TEXAS A&M UNIV,DEPT IND ENGN,COLLEGE STN,TX 77843
基金
美国国家科学基金会;
关键词
scheduling; computational complexity; dynamic programming;
D O I
10.1016/0377-2217(95)00332-0
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We consider the problem of scheduling semiconductor burn-in operations, where burn-in ovens are modeled as batch processing machines. The job release times and due dates are assumed to be agreeable. Two different objective functions are considered: minimize the maximum tardiness and minimize the number of tardy jobs. We study the complexity of the problems. Efficient algorithms are also provided for the case when the job release times, due dates, and processing times are agreeable, which generalize those provided by Lee, Uzsoy and Martin-Vega (1992).
引用
收藏
页码:564 / 569
页数:6
相关论文
共 13 条
[1]   BATCHING AND SCHEDULING JOBS ON BATCH AND DISCRETE PROCESSORS [J].
AHMADI, JH ;
AHMADI, RH ;
DASU, S ;
TANG, CS .
OPERATIONS RESEARCH, 1992, 40 (04) :750-763
[2]  
[Anonymous], 1979, Computers and Intractablity: A Guide to the Theoryof NP-Completeness
[3]   MINIMIZING TOTAL COMPLETION-TIME ON A BATCH PROCESSING MACHINE WITH JOB FAMILIES [J].
CHANDRU, V ;
LEE, CY ;
UZSOY, R .
OPERATIONS RESEARCH LETTERS, 1993, 13 (02) :61-65
[4]   SURVEY OF SCHEDULING RESEARCH INVOLVING DUE DATE DETERMINATION DECISIONS [J].
CHENG, TCE ;
GUPTA, MC .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1989, 38 (02) :156-166
[5]  
COFFMAN E, 1993, ANN OPER RES, V26, P135
[6]   OPTIMAL SCHEDULING OF PRODUCTS WITH 2 SUBASSEMBLIES ON A SINGLE-MACHINE [J].
COFFMAN, EG ;
NOZARI, A ;
YANNAKAKIS, M .
OPERATIONS RESEARCH, 1989, 37 (03) :426-436
[7]   BATCHING TO MINIMIZE FLOW TIMES ON ONE MACHINE [J].
DOBSON, G ;
KARMARKAR, US ;
RUMMEL, JL .
MANAGEMENT SCIENCE, 1987, 33 (06) :784-799
[8]  
HOCHBAUM DS, 1995, SCHEDULING SEMICONDU
[9]   EFFICIENT SCHEDULING ALGORITHMS FOR A SINGLE BATCH PROCESSING MACHINE [J].
IKURA, Y ;
GIMPLE, M .
OPERATIONS RESEARCH LETTERS, 1986, 5 (02) :61-65
[10]   EFFICIENT ALGORITHMS FOR SCHEDULING SEMICONDUCTOR BURN-IN OPERATIONS [J].
LEE, CY ;
UZSOY, R ;
MARTINVEGA, LA .
OPERATIONS RESEARCH, 1992, 40 (04) :764-775