Transmission network expansion planning under deliberate outages

被引:30
作者
Alguacil, Natalia [1 ]
Carrion, Miguel [1 ]
Manuel Arroyo, Jose [1 ]
机构
[1] Univ Castilla La Mancha, ETS Ingenieros Ind, E-13071 Ciudad Real, Spain
关键词
Deliberate outages; Mixed-integer linear programming; Transmission network expansion planning; Vulnerability; ELECTRIC GRID SECURITY; OPTIMIZATION;
D O I
10.1016/j.ijepes.2009.02.001
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
080906 [电磁信息功能材料与结构]; 082806 [农业信息与电气工程];
摘要
The reasons why the transmission network is a potentially attractive target for deliberate outages are twofold: (i) its crucial importance as a critical infrastructure for the society welfare, and (ii) its high level of vulnerability due to the current operation close to its static and dynamic limits. This new context where destructive agents come into play has been recognized by several agencies in Europe and North America, and various initiatives have been launched worldwide in order to assess and mitigate the vulnerability of transmission. Within this framework, this paper proposes the reinforcement and expansion of the transmission network as a way of mitigating the impact of increasingly plausible deliberate outages. The network planner selects the new lines to be built accounting not only for economic issues, as traditionally done, but also for the vulnerability of the transmission network against a set of credible intentional outages. The resulting vulnerability- and economic-constrained transmission expansion planning problem is formulated as a mixed-integer linear program. A number of case studies numerically illustrate the tradeoff between economic- and vulnerability-related issues and its impact on the expansion plans. In addition, we compare the results with those achieved by a traditional expansion planning model based on cost minimization. (C) 2009 Elsevier Ltd. All rights reserved.
引用
收藏
页码:553 / 561
页数:9
相关论文
共 27 条
[1]
Transmission expansion planning: A mixed-integer LP approach [J].
Alguacil, N ;
Motto, AL ;
Conejo, AJ .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2003, 18 (03) :1070-1077
[2]
ALGUACIL N, 2008, P 16 POW SYST COMP C
[3]
On the solution of the bilevel programming formulation of the terrorist threat problem [J].
Arroyo, JM ;
Galiana, FD .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2005, 20 (02) :789-797
[4]
A mixed integer disjunctive model for transmission network expansion [J].
Bahiense, L ;
Oliveira, GC ;
Pereira, M ;
Granville, S .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2001, 16 (03) :560-565
[5]
BROOKE A, 2007, GAMS CPLEX 10 2 SOLV
[6]
Market-based transmission expansion planning [J].
Buygi, MO ;
Balzer, G ;
Shanechi, HM ;
Shahidehpour, M .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2004, 19 (04) :2060-2067
[7]
Vulnerability-constrained transmission expansion planning:: A stochastic programming approach [J].
Carrion, Miguel ;
Arroyo, Jose Manuel ;
Alguacil, Natalia .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2007, 22 (04) :1436-1445
[8]
A method for transmission system expansion planning considering probabilistic reliability criteria [J].
Choi, J ;
Tran, T ;
El-Keib, ARA ;
Thomas, R ;
Oh, S ;
Billinton, R .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2005, 20 (03) :1606-1615
[9]
A kernel-oriented algorithm for transmission expansion planning [J].
Contreras, J ;
Wu, FF .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2000, 15 (04) :1434-1440
[10]
Transmission network expansion planning under an improved genetic algorithm [J].
da Silva, EL ;
Gil, HA ;
Areiza, JM .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2000, 15 (03) :1168-1175