Two years of full-scale storm operation experience

被引:3
作者
Bixio, D [1 ]
Carrette, R [1 ]
Thoeye, C [1 ]
机构
[1] Aquafin NV, Dept Technol, B-2630 Aartselaar, Belgium
关键词
activated sludge; environmental impact; operational costs; pollutant discharge; storm water management;
D O I
10.2166/wst.2002.0676
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Current practice in Flanders is to limit the hydraulic capacity of the wastewater treatment plant to 6Q(14) (Q(14) = 1.7 dry weather flow O-DWF). A maximum of 3Q(14) is treated in the biological system, the excess flow undergoing only physical treatment in the stormtank. This practice has been challenged by a new concept, consisting of the treatment of the full storm sewage flow in the biological train and of the use of the stormtank(s) as additional secondary clarifier(s). This paper reports on the long-term experience gained on a total of 12 full-scale plants. The analysis focused on the parameters subject to regulatory discharge (BOD, COD, suspended solids, total nitrogen and total phosphorus) plus ammonia. Special attention is paid to the performance of the clarification and of the nitrification processes. The significance of the proposed way of operation in attenuating the overall pollution impact on the receiving water body is shown.
引用
收藏
页码:167 / 172
页数:6
相关论文
共 5 条
[1]   Storm operation strategy: high-flow activated sludge process operation [J].
Carrette, R ;
Bixio, D ;
Thoeye, C ;
Ockier, P .
WATER SCIENCE AND TECHNOLOGY, 2000, 41 (09) :193-200
[3]  
KRUIT J, 1998, P NVA S 6 NOV
[4]  
LUST A, 1995, THESIS U GHENT
[5]   The importance of the treatment plant performance during rain to acute water pollution [J].
Rauch, W ;
Harremoes, P .
WATER SCIENCE AND TECHNOLOGY, 1996, 34 (3-4) :1-8