Coordinated preventive maintenance scheduling of GENCO and TRANSCO in restructured power systems

被引:30
作者
Geetha, T. [1 ]
Swarup, K. Shanti [1 ]
机构
[1] Indian Inst Technol, Dept Elect Engn, Madras 600036, Tamil Nadu, India
关键词
Bender's decomposition; Coordination penalty factors; Lagrangian Relaxation; Risk penalty factors; Transmission constraints; ELNS (expected load not served); GENERATION;
D O I
10.1016/j.ijepes.2009.06.006
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Preventive maintenance of generating units and lines, in a competitive electric energy environment is proposed. Inclusion of transmission constraints and forced outage rates, over a specified operational period is considered. For generator maintenance the objective of the ISO is to maintain adequate level of reliability throughout the operational period, for which Bender's decomposition technique is used. The objective of the GENCO is to maximize profit or to minimize loss in profit, for which transmission constrained price based unit commitment (TCPBUC), based on Lagrangian relaxation method is used, Bender's decomposition technique is used for line maintenance, with adequate level of reliability. A coordinating technique using penalty factors is incorporated to obtain convergence of the conflicting objectives. The transmission constraints are modeled using dc sensitivity factors. Detailed case studies of six-bus systems and IEEE RTS system are presented and discussed. (C) 2009 Elsevier Ltd. All rights reserved.
引用
收藏
页码:626 / 638
页数:13
相关论文
共 15 条
[1]  
ALLEN JW, 2004, POWER GENERATION OPE
[2]   Generation maintenance scheduling in restructured power systems [J].
Conejo, AJ ;
García-Bertrand, R ;
Díaz-Salazar, A .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2005, 20 (02) :984-992
[3]   Generation maintenance scheduling considering transmission constraints [J].
da Silva, EL ;
Schilling, MT ;
Rafael, MC .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2000, 15 (02) :838-843
[4]   NEW MAINTENANCE-SCHEDULING METHOD WITH PRODUCTION COST MINIMIZATION VIA INTEGER LINEAR-PROGRAMMING [J].
EDWIN, KW ;
CURTIUS, F .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 1990, 12 (03) :165-170
[5]   Generating unit maintenance scheduling under competitive market environments [J].
Kim, EH ;
Park, JB ;
Park, JK ;
Chun, YH .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2005, 27 (03) :189-194
[6]   MULTIOBJECTIVE PROGRAMMING IN POWER-SYSTEM OPTIMIZATION - NEW APPROACH TO GENERATOR MAINTENANCE SCHEDULING [J].
KRALJ, B ;
RAJAKOVIC, N .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 1994, 16 (04) :211-220
[7]   A flexible unit maintenance scheduling considering uncertainties [J].
Leou, RC .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2001, 16 (03) :552-559
[8]   A new method for unit maintenance scheduling considering reliability and operation expense [J].
Leou, Rong-Ceng .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2006, 28 (07) :471-481
[9]   Transmission-constrained unit commitment based on Benders decomposition [J].
Ma, HL ;
Shahidehpour, SM .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 1998, 20 (04) :287-294
[10]   Integrated generation and transmission maintenance scheduling with network constraints [J].
Marwali, MKC ;
Shahidehpour, SM .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1998, 13 (03) :1063-1068