A Lagrangian heuristic based branch-and-bound approach for the capacitated network design problem

被引:136
作者
Holmberg, K [1 ]
Yuan, D [1 ]
机构
[1] Linkoping Inst Technol, Dept Math, S-58183 Linkoping, Sweden
关键词
D O I
10.1287/opre.48.3.461.12439
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The capacitated network design problem is a multicommodity minimal cost network Row problem with fixed charges on the arcs and is well known to be NP-hard. The problem type is very common in the context of transportation networks, telecommunication networks, etc. In this paper we propose an efficient method for this problem, based on a Lagrangian heuristic within a branch-and-bound framework. The Lagrangian heuristic uses a Lagrangian relaxation to obtain easily solved subproblems and solves the Lagrangian dual by subgradient optimization. It also includes techniques for finding primal feasible solutions. The Lagrangian heuristic is then embedded into a branch-and-bound scheme that yields further primal improvements. Special penalty tests and cutting criteria are developed. The branch-and-bound scheme can either be an exact method that guarantees the optimal solution of the problem or be a quicker heuristic. The method has been tested on networks of various structures and sizes. Computational comparisons between this method and a state-of-the-art mixed-integer code are presented, The method is found to be capable of generating good feasible solutions to large-scale problems within reasonable time and data storage limits.
引用
收藏
页码:461 / 481
页数:21
相关论文
共 27 条
[11]   CONVERGENCE RATES OF SUBGRADIENT OPTIMIZATION METHODS [J].
GOFFIN, JL .
MATHEMATICAL PROGRAMMING, 1977, 13 (03) :329-347
[12]  
Held M., 1974, Mathematical Programming, V6, P62, DOI 10.1007/BF01580223
[13]  
Held M., 1971, MATHEMATICAL PROGRAM, V1, P6, DOI [DOI 10.1007/BF01584070, 10.1007/BF01584070]
[14]   A CHARACTERIZATION OF THE UNCAPACITATED NETWORK DESIGN POLYTOPE [J].
HELLSTRAND, J ;
LARSSON, T ;
MIGDALAS, A .
OPERATIONS RESEARCH LETTERS, 1992, 12 (03) :159-163
[15]   Solving the uncapacitated network design problem by a Lagrangean heuristic and branch-and-bound [J].
Holmberg, K ;
Hellstrand, J .
OPERATIONS RESEARCH, 1998, 46 (02) :247-259
[16]  
HOLMBERG K, 1998, LITHMATR199805 DEP M
[17]  
HOLMBERG K, 1995, LITHMATOPTWP199501 D
[18]  
Iri M., 1960, J OPER RES SOC JPN, V3, P27
[19]  
JEWELL W, 1958, 8 MIT OR CTR
[20]   MULTICOMMODITY NETWORK FLOWS - THE IMPACT OF FORMULATION ON DECOMPOSITION [J].
JONES, KL ;
LUSTIG, IJ ;
FARVOLDEN, JM ;
POWELL, WB .
MATHEMATICAL PROGRAMMING, 1993, 62 (01) :95-117