Refining the delay-time-based PM inspection model with non-negligible system downtime estimates of the expected number of failures

被引:35
作者
Christer, AH [1 ]
Lee, C [1 ]
机构
[1] Univ Salford, Ctr OR & Appl Stat, Salford M5 4WT, Lancs, England
关键词
downtime model; delay time; preventive maintenance; modelling;
D O I
10.1016/S0925-5273(00)00011-6
中图分类号
T [工业技术];
学科分类号
08 [工学];
摘要
In this paper a refinement to the delay-time-based PM model is presented to account for the downtime incurred at failures when estimating the expected number of failures over a PM inspection period. Extensions to PM models have been made in the context of downtime modelling. Previously, in downtime modelling using delay time, it has been generally assumed that the downtime of failures is small compared with a PM cycle length and, therefore, assuming that defects continue to arise uninterrupted during a downtime period has negligible consequences. However, in some cases, it is possible that the cumulative downtime of failure repairs is not sufficiently small. The paper presents revised models for perfect and non-perfect homogeneous processes, and for a perfect non-homogeneous process. Numerical examples are provided to highlight the differences. The revised downtime model is a more sensitive model with which to determine the actual downtime or cost. (C) 2000 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:77 / 85
页数:9
相关论文
共 5 条
[1]
MODELING OF CONDITION BASED MAINTENANCE AT THE COAL FACE [J].
CHILCOTT, JB ;
CHRISTER, AH .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1991, 22 (01) :1-11
[2]
Christer A. H., 1995, IMA Journal of Mathematics Applied in Business and Industry, V6, P205, DOI 10.1093/imaman/6.2.205
[3]
CHRISTER AH, 1984, J OPER RES SOC, V35, P401, DOI 10.1057/jors.1984.80
[4]
Developments in delay time analysis for modelling plant maintenance [J].
Christer, AH .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1999, 50 (11) :1120-1137
[5]
Christer AH, 1997, LECT NOTES ECON MATH, P196