A virtual prototyping system for simulating construction processes

被引:104
作者
Huang, Ting
Kong, C. W.
Guo, H. L.
Baldwin, Andrew
Li, Heng [1 ]
机构
[1] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Hong Kong, Hong Kong, Peoples R China
[2] Hong Kong Polytech Univ, Fac Construct & Land Use, Hong Kong, Hong Kong, Peoples R China
关键词
construction process planning; 3D model; simulation; virtual prototyping;
D O I
10.1016/j.autcon.2006.09.007
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Virtual prototyping (VP) technology has been regarded as a cost-effective way of envisaging real circumstances that enhance effective communication of designs and ideas, without manufacturing physical samples. In the construction field, although a large number of digital technologies have been developed to visualize the innovative architectural design, few VP systems have been developed to facilitate integrated planning and visualization of construction plans of the building projects. This paper describes a virtual prototyping system, called the Construction Virtual Prototyping (CVP) system, which is developed for modeling, simulation, analysis and VP of construction processes from digital design. The CVP system allows project teams to check constructability, safety and to visualize 3D models of a facility before the commencement of construction works. The real-life case study presented in the study shows that the CV-P system is effective in assessing the executability of a construction planning including site layout, temporary work design, as well as resource planning. (c) 2006 Elsevier B.V. All rights reserved.
引用
收藏
页码:576 / 585
页数:10
相关论文
共 13 条
  • [1] 4D dynamic construction management and visualization software: 1. Development
    Chau, KW
    Anson, M
    Zhang, JP
    [J]. AUTOMATION IN CONSTRUCTION, 2005, 14 (04) : 512 - 524
  • [2] CHINI A, 1997, AM SOC CIV ENG 15 ST
  • [3] A virtual prototyping system for rapid product development
    Choi, SH
    Chan, AMM
    [J]. COMPUTER-AIDED DESIGN, 2004, 36 (05) : 401 - 412
  • [4] VIRCON: Interactive system for teaching construction management
    Jaafari, A
    Manivong, KK
    Chaaya, M
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2001, 127 (01): : 66 - 75
  • [5] Feasibility study of 4D CAD in commercial construction
    Koo, B
    Fischer, M
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2000, 126 (04): : 251 - 260
  • [6] KUNZ J, 2005, CASE STUDIES IMPLEME, V97
  • [7] McKinney K., 1997, the 4th Congress of Computing in Civil Engineering, P470
  • [8] PRATT MJ, 1995, VIRTUAL PROTOTYPING, P113
  • [9] A cooperative virtual prototyping system for mechatronic solution elements based assembly
    Shen, Q
    Gausemeier, J
    Bauch, J
    Radkowski, R
    [J]. ADVANCED ENGINEERING INFORMATICS, 2005, 19 (02) : 169 - 177
  • [10] A virtual construction environment for preconstruction planning
    Waly, AF
    Thabet, WY
    [J]. AUTOMATION IN CONSTRUCTION, 2003, 12 (02) : 139 - 154