A new constructive heuristic for the flowshop scheduling problem

被引:101
作者
Koulamas, C [1 ]
机构
[1] Florida Int Univ, Dept Decis Sci & Informat Syst, Miami, FL 33199 USA
关键词
scheduling theory; flowshop; makespan; heuristic;
D O I
10.1016/S0377-2217(97)00027-1
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper presents a simple constructive heuristic (HFC) for the flowshop makespan problem which is capable of producing non-permutation schedules when it deems it appropriate. HFC determines the order of any two jobs in the final schedule based on their order in all two-machine problems embedded in the problem. Computational experiments indicate that HFC performs as well as NEH which is the currently best available constructive heuristic on problems where a permutation schedule is expected to be optimal. However, HFC outperforms NEH on problems where a non-permutation schedule may be optimal. (C) 1998 Elsevier Science B.V.
引用
收藏
页码:66 / 71
页数:6
相关论文
共 28 条
[1]  
[Anonymous], 1970, MANAGE SCI, DOI [10.1287/mnsc.16.10.b630, DOI 10.1287/MNSC.16.10.B630]
[2]   JOHNSONS 3-MACHINE FLOW-SHOP CONJECTURE [J].
BURNS, F ;
ROOKER, J .
OPERATIONS RESEARCH, 1976, 24 (03) :578-580
[3]   EVALUATION OF FLOW SHOP SEQUENCING HEURISTICS [J].
DANNENBRING, DG .
MANAGEMENT SCIENCE, 1977, 23 (11) :1174-1182
[4]  
Garey M. R., 1976, Mathematics of Operations Research, V1, P117, DOI 10.1287/moor.1.2.117
[5]   FLOW-SHOP AND JOB-SHOP SCHEDULES - COMPLEXITY AND APPROXIMATION [J].
GONZALEZ, T ;
SAHNI, S .
OPERATIONS RESEARCH, 1978, 26 (01) :36-52
[6]   FUNCTIONAL HEURISTIC ALGORITHM FOR FLOWSHOP SCHEDULING PROBLEM [J].
GUPTA, JND .
OPERATIONAL RESEARCH QUARTERLY, 1971, 22 (01) :39-&
[7]   A NEW HEURISTIC FOR THE N-JOB, M-MACHINE FLOWSHOP PROBLEM [J].
HO, JC ;
CHANG, YL .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1991, 52 (02) :194-202
[8]   AN EXTENSION OF PALMER HEURISTIC FOR THE FLOW-SHOP SCHEDULING PROBLEM [J].
HUNDAL, TS ;
RAJGOPAL, J .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1988, 26 (06) :1119-1124
[9]  
Johnson S. M., 1954, Naval Research Logistics Quarterly, V1, P61, DOI [DOI 10.1002/NAV.3800010110, 10.1002/nav.3800010110]
[10]   HEURISTICS FOR FLOWSHOP SCHEDULING [J].
KING, JR ;
SPACHIS, AS .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1980, 18 (03) :345-357