Lead-time setting, capacity utilization, and pricing decisions under lead-time dependent demand

被引:23
作者
Palaka, K [1 ]
Erlebacher, S [1 ]
Kropp, DH [1 ]
机构
[1] Washington Univ, John M Olin Sch Business, St Louis, MO 63130 USA
关键词
D O I
10.1023/A:1007414117045
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This research examines the lead-time setting, capacity utilization, and pricing decisions facing a firm serving customers that are sensitive to quoted lead-times. We model the firm's operations as an M/M/1 queue and treat the demand as being linear in price and quoted lead-time. We analyze the quoted lead-time, capacity utilization, and price that maximize revenues less total variable production costs, WIP holding costs, and lateness penalty costs. We use this analysis to show that the capacity utilization should be lower when (1) customers are more sensitive to lead-times and/or (2) the firm incurs higher congestion related costs and/or (3) the penalty for lateness is higher. Further, we study the robustness of optimal profit contributions when the model parameters are mis-estimated.
引用
收藏
页码:151 / 163
页数:13
相关论文
共 18 条
[1]  
[Anonymous], 1990, RES TECHNOL MANAGE
[2]   RELEVANT COSTS, CONGESTION AND STOCHASTICITY IN PRODUCTION ENVIRONMENTS [J].
BANKER, RD ;
DATAR, SM ;
KEKRE, S .
JOURNAL OF ACCOUNTING & ECONOMICS, 1988, 10 (03) :171-197
[3]  
Blackburn J. D., 1991, Time-based competition: the next battleground in American manufacturing
[4]   VOLUME AND CAPACITY INTERACTION IN FACILITY DESIGN [J].
BUSS, AH ;
LAWRENCE, SR ;
KROPP, DH .
IIE TRANSACTIONS, 1994, 26 (04) :36-49
[5]   USER DELAY COSTS AND INTERNAL PRICING FOR A SERVICE FACILITY [J].
DEWAN, S ;
MENDELSON, H .
MANAGEMENT SCIENCE, 1990, 36 (12) :1502-1517
[6]  
Hill A. V., 1992, Production and Operations Management, V1, P185, DOI 10.1111/j.1937-5956.1992.tb00351.x
[7]   MULTIITEM BATCHING HEURISTICS FOR MINIMIZATION OF QUEUING DELAYS [J].
KARMARKAR, US ;
KEKRE, S ;
KEKRE, S .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1992, 58 (01) :99-111
[8]   LOT-SIZING IN MULTI-ITEM MULTI-MACHINE JOB SHOPS [J].
KARMARKAR, US ;
KEKRE, S ;
KEKRE, S .
IIE TRANSACTIONS, 1985, 17 (03) :290-298
[9]   LOT-SIZING AND LEAD-TIME PERFORMANCE IN A MANUFACTURING CELL [J].
KARMARKAR, US ;
KEKRE, S ;
KEKRE, S ;
FREEMAN, S .
INTERFACES, 1985, 15 (02) :1-9
[10]  
KLEINROCK L, 1975, QUEUEING SYSTEMS, V1, P196