MULTIITEM BATCHING HEURISTICS FOR MINIMIZATION OF QUEUING DELAYS

被引:36
作者
KARMARKAR, US
KEKRE, S
KEKRE, S
机构
[1] EASTMAN KODAK CO,ROCHESTER,NY 14650
[2] CARNEGIE MELLON UNIV,GRAD SCH IND ADM,PITTSBURGH,PA 15213
关键词
BATCHING; LEAD TIMES; MULTIITEM HEURISTICS;
D O I
10.1016/0377-2217(92)90239-6
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Queueing delays in complex manufacturing facilities often constitute the major part of manufacturing lead times. Lead times are in turn primary determinants of manufacturing performance since they affect work-in-process inventory levels, safety stock requirements and schedule performance. Similarly, in service contexts, the costs of waiting in queues form an important aspect of service performance. In many manufacturing and in some service facilities, it is possible to control queueing behavior through batching policies. Here a single facility multi-item (multi-class) model relating batching to queueing delays is formulated. Heuristic batching rules are developed, and the relationship of batch size and queue time to system parameters such as setup times, is explored. The heuristics are tested numerically, and found to be very effective.
引用
收藏
页码:99 / 111
页数:13
相关论文
共 20 条
[1]   MULTIPRODUCT OPTIMAL BATCH SIZES WITH IN-PROCESS INVENTORIES AND MULTI WORK CENTERS [J].
BERTRAND, JWM .
IIE TRANSACTIONS, 1985, 17 (02) :157-163
[2]   MODELS FOR UNDERSTANDING FLEXIBLE MANUFACTURING SYSTEMS [J].
BUZACOTT, JA ;
SHANTHIKUMAR, JG .
AIIE TRANSACTIONS, 1980, 12 (04) :339-350
[3]  
Conway R, 1967, THEORY SCHEDULING
[4]   BATCHING TO MINIMIZE FLOW TIMES ON ONE MACHINE [J].
DOBSON, G ;
KARMARKAR, US ;
RUMMEL, JL .
MANAGEMENT SCIENCE, 1987, 33 (06) :784-799
[5]   BATCHING TO MINIMIZE FLOW TIMES ON PARALLEL HETEROGENEOUS MACHINES [J].
DOBSON, G ;
KARMARKAR, US ;
RUMMEL, JL .
MANAGEMENT SCIENCE, 1989, 35 (05) :607-613
[6]   JOBSHOP-LIKE QUEUING-SYSTEMS [J].
JACKSON, JR .
MANAGEMENT SCIENCE, 1963, 10 (01) :131-142
[7]   CAPACITY ANALYSIS OF A MANUFACTURING CELL [J].
KARMARKAR, US ;
KEKRE, S ;
KEKRE, S .
JOURNAL OF MANUFACTURING SYSTEMS, 1987, 6 (03) :165-175
[8]   LOT SIZES, LEAD TIMES AND IN-PROCESS INVENTORIES [J].
KARMARKAR, US .
MANAGEMENT SCIENCE, 1987, 33 (03) :409-418
[9]   LOT-SIZING AND SEQUENCING DELAYS [J].
KARMARKAR, US .
MANAGEMENT SCIENCE, 1987, 33 (03) :419-423
[10]   LOT-SIZING IN MULTI-ITEM MULTI-MACHINE JOB SHOPS [J].
KARMARKAR, US ;
KEKRE, S ;
KEKRE, S .
IIE TRANSACTIONS, 1985, 17 (03) :290-298