An EMQ model with inspections and random machine failures

被引:30
作者
Makis, V [1 ]
Fung, J [1 ]
机构
[1] Univ Toronto, Toronto, ON, Canada
关键词
optimisation; production; quality; repair; scheduling;
D O I
10.1038/sj.jors.2600484
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In the classical Economic Manufacturing Quantity (EMQ) model, it is assumed that all items produced are of perfect quality and the production facility never breaks down. However, in real production, the product quality is usually a function of the state of the production process which may deteriorate over time and the production facility may fail randomly. In this paper, we study the effect of machine failures on the optimal lot size and on the optimal number of inspections in a production cycle, The formula for the long-run expected average cost per unit time is obtained for a generally distributed time to failure. An optimal production/inspection policy is found by minimising the expected average cost.
引用
收藏
页码:66 / 76
页数:11
相关论文
共 13 条
[1]   AN ECONOMIC ORDER QUANTITY MODEL WITH DEMAND-DEPENDENT UNIT PRODUCTION COST AND IMPERFECT PRODUCTION PROCESSES [J].
CHENG, TCE .
IIE TRANSACTIONS, 1991, 23 (01) :23-28
[2]   PRODUCTION LOT SIZING WITH MACHINE BREAKDOWNS [J].
GROENEVELT, H ;
PINTELON, L ;
SEIDMANN, A .
MANAGEMENT SCIENCE, 1992, 38 (01) :104-123
[3]   PRODUCTION BATCHING WITH MACHINE BREAKDOWNS AND SAFETY STOCKS [J].
GROENEVELT, H ;
PINTELON, L ;
SEIDMANN, A .
OPERATIONS RESEARCH, 1992, 40 (05) :959-971
[4]   OPTIMAL INVENTORY CONTROL IN A PRODUCTION FLOW SYSTEM WITH FAILURES [J].
HOPP, WJ ;
PATI, N ;
JONES, PC .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1989, 27 (08) :1367-1384
[5]   A PRODUCTION AND MAINTENANCE PLANNING-MODEL WITH RESTORATION COST DEPENDENT ON DETECTION DELAY [J].
LEE, HL ;
ROSENBLATT, MJ .
IIE TRANSACTIONS, 1989, 21 (04) :368-375
[6]   SIMULTANEOUS DETERMINATION OF PRODUCTION CYCLE AND INSPECTION SCHEDULES IN A PRODUCTION SYSTEM [J].
LEE, HL ;
ROSENBLATT, MJ .
MANAGEMENT SCIENCE, 1987, 33 (09) :1125-1136
[8]  
LEE JS, 1991, J OPER RES SOC, V42, P775, DOI 10.1057/jors.1991.148
[9]   THE IMPACT OF INSPECTION DELAY ON PROCESS AND INSPECTION LOT SIZING [J].
PORTEUS, EL .
MANAGEMENT SCIENCE, 1990, 36 (08) :999-1007
[10]   OPTIMAL LOT SIZING, PROCESS QUALITY IMPROVEMENT AND SETUP COST REDUCTION [J].
PORTEUS, EL .
OPERATIONS RESEARCH, 1986, 34 (01) :137-144