A comparative analysis of sequencing heuristics for solving the Toyota Goal Chasing problem

被引:19
作者
Celano, G [1 ]
Costa, A [1 ]
Fichera, S [1 ]
机构
[1] Univ Catania, Dipartimento Ingn Ind & Meccan, I-95125 Catania, Italy
关键词
assembly line; sequencing; heuristic algorithms;
D O I
10.1016/j.rcim.2004.07.009
中图分类号
TP39 [计算机的应用];
学科分类号
081203 [计算机应用技术]; 0835 [软件工程];
摘要
In this paper, the sequencing of a mixed model paced assembly line is investigated assuming the component parts usage smoothing as the goal of the sequence selection. This sequencing problem, commonly known as Toyota Goal Chasing method, is Studied here taking into account not only the traditional Goal Chasing approaches, which assume zero-length assembly lines, but also models which consider the effective length of the assembly line. This means that the number of workstations and their extensions become critical parameters in the selection of the optimal sequence of models to be assembled: in fact, the epochs corresponding to the requirement of different components vary in accordance to the values of the line parameters. The sequencing of the parts is carried out here through a set of heuristic procedures, the commonly adopted Goal Chasing algorithms and a simulated annealing, whose performances are compared with respect to different line scenarios. In particular, the numbers of workstations, parts to be worked and components to be assembled are varied to statistically test their influence on the efficiency of the optimizing procedures and on the differences between zero and finite length approaches. (C) 2004 Elsevier Ltd. All rights reserved.
引用
收藏
页码:573 / 581
页数:9
相关论文
共 11 条
[1]
[Anonymous], EUROPEAN J OPERATION
[2]
Heuristics and exact algorithms for solving the Monden problem [J].
Bautista, J ;
Companys, R ;
Corominas, A .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 88 (01) :101-113
[3]
CELANO G, 2003, P 1O C FLEX AUT INT, P307
[4]
Mixed-model assembly line sequencing heuristics for smoothing component parts usage: a comparative analysis [J].
Duplaga, EA ;
Bragg, DJ .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1998, 36 (08) :2209-2224
[6]
SCHEDULING MIXED-MODEL MULTI-LEVEL JUST-IN-TIME PRODUCTION SYSTEMS [J].
MILTENBURG, J ;
SINNAMON, G .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1989, 27 (09) :1487-1509
[7]
Monden Y., 1998, Toyota Production System - An Integrated Approach to Just-in-Time
[8]
A COMPARATIVE-ANALYSIS OF SEQUENCING PROCEDURES FOR MIXED-MODEL ASSEMBLY LINES IN A JUST-IN-TIME PRODUCTION SYSTEM [J].
SUMICHRAST, RT ;
RUSSELL, RS ;
TAYLOR, BW .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1992, 30 (01) :199-214
[9]
Xiaobo Z., 1997, Computers & Industrial Engineering, V32, P47, DOI 10.1016/S0360-8352(96)00193-3
[10]
SEQUENCING TO MINIMIZE WORK OVERLOAD IN ASSEMBLY LINES WITH PRODUCT OPTIONS [J].
YANO, CA ;
RACHAMADUGU, R .
MANAGEMENT SCIENCE, 1991, 37 (05) :572-586