A bidirectional heuristic for stochastic assembly line balancing Type II problem

被引:41
作者
Liu, SB [1 ]
Ong, HL [1 ]
Huang, HC [1 ]
机构
[1] Natl Univ Singapore, Dept Ind & Syst Engn, Singapore 119620, Singapore
关键词
assembly line balancing problem; heuristic;
D O I
10.1007/s00170-003-1833-5
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 [计算机科学与技术];
摘要
In this paper, a heuristic algorithm is proposed to solve the single-model stochastic assembly line balancing Type II problem. For a given number of workstations and a pre-specified assembly line reliability, which is the probability of the workload not exceeding the cycle time for the whole assembly line, the proposed algorithm tries to obtain a solution with the smallest cycle time. In the first stage, the tasks are assigned to workstations from the forward and backward directions alternatively. In the second stage, the workload is smoothed by swapping tasks among workstations. At last, the upper bound of the cycle time obtained in the second stage is reduced step by step until the smallest cycle time satisfies the pre-specified assembly line reliability. The performance of the proposed algorithm is compared with a modified version of Moodie and Young's algorithm by applying them to some literature problems. The computational results show that the proposed algorithm is efficient in minimizing the cycle time for the single-model stochastic assembly line balancing problem.
引用
收藏
页码:71 / 77
页数:7
相关论文
共 22 条
[1]
Anderson E. J., 1994, ORSA Journal on Computing, V6, P161, DOI 10.1287/ijoc.6.2.161
[2]
A SURVEY OF EXACT ALGORITHMS FOR THE SIMPLE ASSEMBLY LINE BALANCING PROBLEM [J].
BAYBARS, I .
MANAGEMENT SCIENCE, 1986, 32 (08) :909-932
[3]
CARTER JC, 1984, J OPERATIONS MANAGEM, V4, P145
[4]
A survey of the assembly line balancing procedures [J].
Erel, E ;
Sarin, SC .
PRODUCTION PLANNING & CONTROL, 1998, 9 (05) :414-434
[5]
A COMPREHENSIVE LITERATURE-REVIEW AND ANALYSIS OF THE DESIGN, BALANCING AND SCHEDULING OF ASSEMBLY SYSTEMS [J].
GHOSH, S ;
GAGNON, RJ .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1989, 27 (04) :637-670
[6]
A new line remedial policy for the paced lines with stochastic task times [J].
Gökçen, H ;
Baykoç, ÖF .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1999, 58 (02) :191-197
[7]
ASSEMBLY LINE BALANCING WITH A PRECEDENCE MATRIX [J].
HOFFMANN, TR .
MANAGEMENT SCIENCE, 1963, 9 (04) :551-562
[8]
ASSEMBLY LINE BALANCING - A SET OF CHALLENGING PROBLEMS [J].
HOFFMANN, TR .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1990, 28 (10) :1807-1815
[9]
Dual criteria assembly line balancing for single-model and deterministic problems using simulated annealing [J].
Hong, DS ;
Cho, HS .
INTELLIGENT AUTOMATION AND SOFT COMPUTING, 2001, 7 (01) :63-73
[10]
IGNALL EJ, 1965, J IND ENGINEERING, V16, P244