Requirements for building information modeling based lean production management systems for construction

被引:192
作者
Sacks, Rafael [1 ]
Radosavljevic, Milan [2 ]
Barak, Ronen [1 ]
机构
[1] Technion Israel Inst Technol, Fac Civil & Env Eng, Haifa, Israel
[2] Univ Reading, Sch Construct Management & Engn, Reading, Berks, England
关键词
Building information modeling; Lean construction; Process visualization; Production control; KanBIM; VISUALIZATION; GAME;
D O I
10.1016/j.autcon.2010.02.010
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Smooth flow of production in construction is hampered by disparity between individual trade teams' goals and the goals of stable production flow for the project as a whole. This is exacerbated by the difficulty of visualizing the flow of work in a construction project. While the addresses some of the issues in Building information modeling provides a powerful platform for visualizing work flow in control systems that also enable pull flow and deeper collaboration between teams on and off site. The requirements for implementation of a BIM-enabled pull flow construction management software system based on the Last Planner System, called 'KanBIM', have been specified, and a set of functional mock-ups of the proposed system has been implemented and evaluated in a series of three focus group workshops. The requirements cover the areas of maintenance of work flow stability, enabling negotiation and commitment between teams, lean production planning with sophisticated pull flow control, and effective communication and visualization of flow. The evaluation results show that the system holds the potential to improve work flow and reduce waste by providing both process and product visualization at the work face. (C) 2010 Elsevier B.V. All rights reserved.
引用
收藏
页码:641 / 655
页数:15
相关论文
共 41 条
  • [1] Automated generation of work spaces required by construction activities
    Akinci, B
    Fischer, M
    Kunz, J
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2002, 128 (04): : 306 - 315
  • [2] [Anonymous], 1999, P 7 ANN C INT GROUP
  • [3] [Anonymous], 2000, Research on planning and control of construction production based on VisiLean in IPD mode
  • [4] ARBULU R, 2005, 13 C INT GROUP LEAN, P199
  • [5] Ballard H., 2000, The Last Planner System of Production Control
  • [6] Production system loading-cycle time relationship in residential construction
    Bashford, HH
    Walsh, KD
    Sawhney, A
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2005, 131 (01) : 15 - 22
  • [7] BORTOLAZZA RC, 2005, LEAN CONSTRUCTION, V13, P413
  • [8] BOSCHE F, 2007, ASCE INT WORKSHOP CO, V261, P648
  • [9] 4D dynamic construction management and visualization software: 1. Development
    Chau, KW
    Anson, M
    Zhang, JP
    [J]. AUTOMATION IN CONSTRUCTION, 2005, 14 (04) : 512 - 524
  • [10] WorkPlan: Constraint-based database for work package scheduling
    Choo, HJ
    Tommelein, ID
    Ballard, G
    Zabelle, TR
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 1999, 125 (03) : 151 - 160