Integrating simulation and optimization to schedule a hybrid flow shop with maintenance constraints

被引:149
作者
Allaoui, H [1 ]
Artiba, A [1 ]
机构
[1] FUCAM, CREGI, B-7000 Mons, Belgium
关键词
hybrid flow shop; maintenance constraints; simulation; optimization;
D O I
10.1016/j.cie.2004.09.002
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The scheduling problems have been discussed in the literature extensively under. the assumption that machines are continuously available. However, in most real life industrial settings a machine can be unavailable for many reasons, such as unforeseen breakdowns (stochastic unavailability) or due to a scheduled preventive maintenance where the periods of unavailability are known in advance (deterministic unavailability). In this paper, we deal with the hybrid flow shop scheduling problem under maintenance constraints to optimize several objectives based on flow time and due date. In this model, we take also on consideration setup, cleaning and transportation times. This paper has three goals. The first is to show how we can integrate simulation and optimization to tackle this practical problem which is NP-hard on the strong sense. The second is to illustrate by an experimentation study that the performance of heuristics applied to this problem can be affected by the percentage of the breakdown times. The last is to show that this approach can perform better than NEH heuristics under certain conditions. (C) 2004 Elsevier Ltd. All rights reserved.
引用
收藏
页码:431 / 450
页数:20
相关论文
共 56 条
[32]   Machine scheduling with an availability constraint [J].
Lee, CY .
JOURNAL OF GLOBAL OPTIMIZATION, 1996, 9 (3-4) :395-416
[33]   PARALLEL MACHINES SCHEDULING WITH NONSIMULTANEOUS MACHINE AVAILABLE TIME [J].
LEE, CY .
DISCRETE APPLIED MATHEMATICS, 1991, 30 (01) :53-61
[34]   Current trends in deterministic scheduling [J].
Lee, CY ;
Lei, L ;
Pinedo, M .
ANNALS OF OPERATIONS RESEARCH, 1997, 70 (0) :1-41
[35]   MINIMIZING MAKESPAN IN HYBRID FLOWSHOPS [J].
LEE, CY ;
VAIRAKTARAKIS, GL .
OPERATIONS RESEARCH LETTERS, 1994, 16 (03) :149-158
[36]   Hybrid flow shop scheduling: A survey [J].
Linn, R ;
Zhang, W .
COMPUTERS & INDUSTRIAL ENGINEERING, 1999, 37 (1-2) :57-61
[37]  
LIU Z, 1995, J OPERATIONAL RES, V114, P420
[38]   EQUATION OF STATE CALCULATIONS BY FAST COMPUTING MACHINES [J].
METROPOLIS, N ;
ROSENBLUTH, AW ;
ROSENBLUTH, MN ;
TELLER, AH ;
TELLER, E .
JOURNAL OF CHEMICAL PHYSICS, 1953, 21 (06) :1087-1092
[39]  
MITTENTHALL J, 1993, OPER RES, V30, P148
[40]   Intelligent manufacturing-simulation agents tool (IMSAT) [J].
Nadoli, Gajanana ;
Biegel, John E. .
ACM Transactions on Modeling and Computer Simulation, 1993, 3 (01) :42-65