Lead time and response time in a pull production control system

被引:15
作者
Kim, I [1 ]
Tang, CS [1 ]
机构
[1] UNIV CALIF LOS ANGELES, ANDERSON GRAD SCH MANAGEMENT, LOS ANGELES, CA 90095 USA
关键词
manufacturing; customer service; queuing models; pull systems; time-based competition;
D O I
10.1016/S0377-2217(96)00174-9
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In the late 80s, most manufacturers have shifted their manufacturing strategies from cost and quality to speed. This paper focuses on two performance measures of speed: manufacturing lead time and response time. Manufacturing lead time is the sum of the processing time to convert raw material to finished goods and the waiting time at the buffers. Response time is the time between the customer places an order and the customer receives the order, In this paper we develop a queueing model of a pull-based production central system for a single-stage facility. The intent of the model is two-fold. First, we highlight the trade-off between manufacturing lead time and response time. Second,we develop an optimization model to determine an optimal control system that guarantees certain delivery performance (in terms of response time). (C) 1997 Elsevier Science B.V.
引用
收藏
页码:474 / 485
页数:12
相关论文
共 29 条
[1]  
[Anonymous], 1990, RES TECHNOL MANAGE
[2]   A MODEL FOR CONTINUOUS-REVIEW PULL POLICIES IN SERIAL INVENTORY SYSTEMS [J].
BADINELLI, RD .
OPERATIONS RESEARCH, 1992, 40 (01) :142-156
[3]  
Berkeley B. J., 1992, Production and Operations Management, V1, P393, DOI 10.1111/j.1937-5956.1992.tb00004.x
[4]   A MATHEMATICAL-PROGRAMMING APPROACH TO A DETERMINISTIC KANBAN SYSTEM [J].
BITRAN, GR ;
LI, C .
MANAGEMENT SCIENCE, 1987, 33 (04) :427-441
[5]  
BITRAN GR, 1984, ROBOTICS COMPUTER IN, V1, P327
[6]  
Blackburn J. D., 1991, Time-based competition: the next battleground in American manufacturing
[7]  
Buzacott J.A., 1993, STOCHASTIC MODELS MA
[8]   QUEUING MODELS OF KANBAN AND MRP CONTROLLED PRODUCTION SYSTEMS [J].
BUZACOTT, JA .
ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1989, 17 (1-4) :3-20
[9]   EMPIRICAL-EVALUATION OF A QUEUING NETWORK MODEL FOR SEMICONDUCTOR WAFER FABRICATION [J].
CHEN, H ;
HARRISON, JM ;
MANDELBAUM, A ;
VANACKERE, A ;
WEIN, LM .
OPERATIONS RESEARCH, 1988, 36 (02) :202-215
[10]   KANBAN CONTROLLED PULL SYSTEMS - AN ANALYTIC APPROACH [J].
DELEERSNYDER, JL ;
HODGSON, TJ ;
MULLER, H ;
OGRADY, PJ .
MANAGEMENT SCIENCE, 1989, 35 (09) :1079-1091