Managing increasing product variety at integrated steel mills

被引:23
作者
Denton, B
Gupta, D
Jawahir, K
机构
[1] IBM Corp, Microelect Div, Essex Jct, VT 05452 USA
[2] Univ Minnesota, Dept Mech Engn, Minneapolis, MN 55455 USA
[3] Dofasco Ltd, Hamilton, ON L8N 3J5, Canada
关键词
industries : mining; metals; inventory production : applications;
D O I
10.1287/inte.33.2.41.16373
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Intense market competition in recent years has made it increasingly important for integrated steel mills (ISMs) to differentiate themselves from competitors based on customer service, two key attributes of which are the duration and the reliability of order-fulfillment time. To improve responsiveness, some ISMs are shifting from a pure make-to-order system toward a hybrid make-to-stock, make-to-order system. They can then match certain customer orders to existing semifinished inventory, thereby reducing the time it takes to fill those orders. However, choosing which semifinished products to make to stock and how to manage their inventory are difficult problems. We developed an optimization model that one ISM implemented as a decision-support tool for choosing the designs of made-for-stock (MFS) slabs. Use of the model has reduced the number of MFS slab designs and increased the proportion of orders covered by those designs.
引用
收藏
页码:41 / 53
页数:13
相关论文
共 33 条
[1]  
[Anonymous], INTEGER COMBINATORIA
[2]  
AXSATER S, 2000, KLUWER INT SERIES OP
[3]   Process planning for aluminum tubes: An engineering-operations perspective [J].
Balakrishnan, A ;
Brown, S .
OPERATIONS RESEARCH, 1996, 44 (01) :7-20
[4]   A COMPUTER-BASED STRATEGIC-PLANNING SYSTEM FOR STEEL PRODUCTION [J].
BIELEFELD, FW ;
WALTER, KD ;
WARTMANN, R .
INTERFACES, 1986, 16 (04) :41-46
[5]  
Boukas E. K., 1990, Annals of Operations Research, V26, P289
[6]   A SCHEDULING MODEL FOR LTV STEELS CLEVELAND WORKS TWIN STRAND CONTINUOUS SLAB CASTER [J].
BOX, RE ;
HERBE, DG .
INTERFACES, 1988, 18 (01) :42-56
[7]   A linear programming model for integrated steel production and distribution planning [J].
Chen, MY ;
Wang, WM .
INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 1997, 17 (5-6) :592-&
[8]   LOCATION OF BANK ACCOUNTS TO OPTIMIZE FLOAT - ANALYTIC STUDY OF EXACT AND APPROXIMATE ALGORITHMS [J].
CORNUEJOLS, G ;
FISHER, ML ;
NEMHAUSER, GL .
MANAGEMENT SCIENCE, 1977, 23 (08) :789-810
[9]   A DYNAMIC SCHEDULING AND CONTROL-SYSTEM IN AN ENSIDESA STEEL PLANT [J].
DIAZ, A ;
SANCHO, L ;
GARCIA, R ;
LARRANETA, J .
INTERFACES, 1991, 21 (05) :53-62
[10]  
DUTTA G, 1995, INFORMS NEW ORL M NE