A review on evolution of production scheduling with neural networks

被引:80
作者
Akyol, Derya Eren [1 ]
Bayhan, G. Mirac [1 ]
机构
[1] Dokuz Eylul Univ, Dept Ind Engn, TR-35100 Bornova, Turkey
关键词
artificial neural networks; production scheduling; review;
D O I
10.1016/j.cie.2007.04.006
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The production scheduling problem allocates limited resources to tasks over time and determines the sequence of operations so that the constraints of the system are met and the performance criteria are optimized. One approach to this problem is the use of artificial neural networks (ANNs) stand alone or in conjunction with other methods. Artificial neural networks are computational structures that implement simplified models of biological processes, and are preferred for their robustness, massive parallelism, and learning ability. In this paper, we give a comprehensive overview on ANN approaches for solution of production scheduling problems, discuss both theoretical developments and practical experiences, and identify research trends. More than 50 major production and operations management journals published in years 1988-2005 have been reviewed. Existing approaches are classified into four groups, and additionally a historical progression in this field was emphasized. Finally, recommendations for future research are suggested in this paper. (c) 2007 Elsevier Ltd. All rights reserved.
引用
收藏
页码:95 / 122
页数:28
相关论文
共 124 条
[81]   THE PARALLEL GENETIC ALGORITHM AS FUNCTION OPTIMIZER [J].
MUHLENBEIN, H ;
SCHOMISCH, M ;
BORN, J .
PARALLEL COMPUTING, 1991, 17 (6-7) :619-632
[82]  
NAWAZ M, 1991, OMEGA, V11, P91
[83]  
OSMAN IH, 2002, COMPUT IND ENG, P205
[84]  
Palmes PP, 2003, IEEE IJCNN, P478
[85]   Scheduling jobs on parallel machines applying neural network and heuristic rules [J].
Park, YS ;
Kim, SY ;
Lee, YH .
COMPUTERS & INDUSTRIAL ENGINEERING, 2000, 38 (01) :189-202
[86]  
Parker D. B, 1985, TR47 CTR COMP RES EC
[87]  
Peterson C., 1987, Complex Systems, V1, P995
[88]   USING NEURAL NETWORKS TO DETERMINE INTERNALLY-SET DUE-DATE ASSIGNMENTS FOR SHOP SCHEDULING [J].
PHILIPOOM, PR ;
PEES, LP ;
WIEGMANN, L .
DECISION SCIENCES, 1994, 25 (5-6) :825-851
[89]  
Potvin JY, 2003, INT SER OPER RES MAN, V57, P429, DOI 10.1007/0-306-48056-5_15
[90]  
Priore P., 2003, Integrated Manufacturing Systems, V14, P160, DOI 10.1108/09576060310459456