A heuristic algorithm for mean flowtime objective in flowshop scheduling

被引:92
作者
Woo, HS [1 ]
Yim, DS
机构
[1] Syst Engn Res Inst, Taejon 305333, South Korea
[2] Hannam Univ, Dept Ind Engn, Taejon 300791, South Korea
关键词
D O I
10.1016/S0305-0548(97)00050-6
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Based on a job insertion method, a heuristic algorithm is developed to reduce the mean flowtime in a permutation flowshop environment. Simulation experiments are performed to evaluate effectiveness of the proposed algorithm against the existing heuristic methods. The simulation results show that the proposed algorithm generates more accurate solutions than other heuristics, especially when ratio of the number of jobs and the number of machines is greater than or equal to two. (C) 1998 published by Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:175 / 182
页数:8
相关论文
共 24 条
[1]  
ADIRI I, 1982, NAV RES LOG, V29, P395
[2]   IMPROVED LOWER BOUNDS FOR MINIMIZING THE SUM OF COMPLETION TIMES OF N-JOBS OVER M-MACHINES IN A FLOW-SHOP [J].
AHMADI, RH ;
BAGCHI, U .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1990, 44 (03) :331-336
[3]  
[Anonymous], 1970, MANAGE SCI, DOI [10.1287/mnsc.16.10.b630, DOI 10.1287/MNSC.16.10.B630]
[4]  
Baker KR., 1974, Introduction to Sequencing and Scheduling
[5]  
Bansal S. P., 1977, AIIE Transactions, V9, P306, DOI 10.1080/05695557708975160
[6]   NEW BOUND FOR MACHINE SCHEDULING [J].
BESTWICK, PF ;
HASTINGS, NAJ .
OPERATIONAL RESEARCH QUARTERLY, 1976, 27 (02) :479-487
[7]   EVALUATION OF FLOW SHOP SEQUENCING HEURISTICS [J].
DANNENBRING, DG .
MANAGEMENT SCIENCE, 1977, 23 (11) :1174-1182
[8]  
Garey M. R., 1976, Mathematics of Operations Research, V1, P117, DOI 10.1287/moor.1.2.117
[9]  
Gupta J. N. D., 1972, AIIE T, V4, P11, DOI DOI 10.1080/05695557208974823
[10]   A NEW HEURISTIC FOR THE N-JOB, M-MACHINE FLOWSHOP PROBLEM [J].
HO, JC ;
CHANG, YL .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1991, 52 (02) :194-202