service rate;
inventory;
multi-stage assembly system;
D O I:
10.1111/1467-9574.00135
中图分类号:
O21 [概率论与数理统计];
C8 [统计学];
学科分类号:
020208 ;
070103 ;
0714 ;
摘要:
In convergent multi-stage systems usually a pull strategy is assumed, where demand at the end stock-point triggers demands (or production) at the proceeding stock-point, whereas in the push strategy demand is triggered at the initial stock-point. We will extensively describe the calculation procedure for the push strategy. for analyzing the pull strategy we will use existing methods. The equivalence and differences between these two strategies will be illustrated for a two-stage assembly case.