A heuristic for component switching on SMT placement machines

被引:18
作者
Gronalt, M
Grunow, M
Gunther, HO
Zeller, R
机构
[1] Tech Univ Berlin, Inst Ind Management, D-10585 Berlin, Germany
[2] Univ Vienna, Dept Prod & Logist, A-1210 Vienna, Austria
基金
奥地利科学基金会;
关键词
printed circuit board assembly; surface mount technology (SMT); automated assembly systems; component set-up; feeder assignment;
D O I
10.1016/S0925-5273(97)00119-9
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper a heuristic solution procedure is developed to deal with the component switching problem, which arises in printed circuit board assembly. In the first stage of the recursive heuristic, we determine the component set-up for a given sequence of board types to be processed on a single placement machine by applying a modification of the so-called 'keep component needed soonest' policy. In the second stage, component feeders are assigned to slots in the magazine of the placement machine. Recursions to the first stage allow feasible solutions to be generated very fast for all instances of the numerical experiments. These solutions differ only slightly from those obtained for the relaxed problem for which the assignment restrictions are omitted.
引用
收藏
页码:181 / 190
页数:10
相关论文
共 8 条
[1]   COMPONENT FIXTURE POSITIONING/SEQUENCING FOR PRINTED-CIRCUIT BOARD ASSEMBLY WITH CONCURRENT OPERATIONS [J].
AHMADI, J ;
AHMADI, R ;
MATSUO, H ;
TIRUPATI, D .
OPERATIONS RESEARCH, 1995, 43 (03) :444-457
[2]   A HEURISTIC FOR MINIMIZING THE NUMBER OF TOOL SWITCHES ON A FLEXIBLE MACHINE [J].
BARD, JF .
IIE TRANSACTIONS, 1988, 20 (04) :382-391
[3]  
Crama Y., 1996, PRODUCTION PLANNING
[4]  
GUNTHER HO, 1997, IN PRESS PROD PLANN
[5]  
OERLEMANS A, 1992, THESIS U LIMBURG MAA
[6]  
ROWLAND R, 1993, APPL SURFACE MOUNT A
[7]   A HEURISTIC ALGORITHM FOR MINIMIZING TOTAL PRODUCTION TIME FOR A SEQUENCE OF JOBS ON A SURFACE MOUNT PLACEMENT MACHINE [J].
SADIQ, M ;
LANDERS, TL ;
TAYLOR, GD .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1993, 31 (06) :1327-1341
[8]   MODELS ARISING FROM A FLEXIBLE MANUFACTURING MACHINE .1. MINIMIZATION OF THE NUMBER OF TOOL SWITCHES [J].
TANG, CS ;
DENARDO, EV .
OPERATIONS RESEARCH, 1988, 36 (05) :767-777