Performance metrics in supply chain management

被引:174
作者
Kleijnen, JPC [1 ]
Smits, MT [1 ]
机构
[1] UVT, Tilburg, Netherlands
关键词
supply chain; logistics; performance measurement; balanced scorecard; simulation; system dynamics;
D O I
10.1057/palgrave.jors.2601539
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This survey paper starts with a critical analysis of various performance metrics for supply chain management (SCM), used by a specific manufacturing company. Then it summarizes how economic theory treats multiple performance metrics. Actually. the paper proposes to deal with multiple metrics in SCM via the balanced scorecard - which measures customers. internal processes, innovations, and finance. To forecast how the values of these metrics will change - once a supply chain is redesigned - simulation may be used. This paper distinguishes four simulation types for S M: (i) spreadsheet simulation. (ii) system dynamics, (iii) discrete-event simulation, and (iv) business games. These simulation types may explain the bullwhip effect, predict fill rate values, and educate and train users. Validation of simulation models requires sensitivity analysis; a statistical methodology is proposed. The paper concludes with suggestions for a possible research agenda in SCM. A list with 50 references for further study is included.
引用
收藏
页码:507 / 514
页数:8
相关论文
共 50 条
[41]   Applications and opportunities for operations research in Internet-enabled supply chains and electronic marketplaces [J].
Sodhi, MS .
INTERFACES, 2001, 31 (02) :56-69
[42]   Penalties, rewards, and inspection: provisions for quality in supply chain contracts [J].
Starbird, SA .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2001, 52 (01) :109-115
[43]  
Sterman JohnD., 2000, BUSINESS DYNAMICS
[44]  
TENWOLDE H, 2000, ORIMS TODAY, V27, P12
[45]  
Van Groenendaal WJH, 1998, EC APPRAISAL NATURAL
[46]  
VANSCHAIK FDJ, 2000, OPERATIONELE KENGETA, P46
[47]  
VANSCHAIK FDJ, 1986, LAB INFORMATIESYSTEM
[48]  
Viswanadham N, 2000, J OPER RES SOC, V51, P1158
[49]  
Vollmann T.E., 1997, MANUFACTURING PLANNI, V4th
[50]  
[No title captured]