COMPLEX EVALUATION OF CONTRACTS FOR CONSTRUCTION

被引:69
作者
Podvezko, Valentinas [1 ]
Mitkus, Sigitas [1 ]
Trinkuniene, Eva [1 ]
机构
[1] Vilnius Gediminas Tech Univ, LT-10223 Vilnius, Lithuania
关键词
contract for construction; multicriteria evaluation; criterion; AHP method; consistency of expert estimates; DECISION-MAKING; SOCIAL-DEVELOPMENT; CRITERIA; SELECTION; RANKING; SYSTEM; NORMALIZATION; ALTERNATIVES; ATTRIBUTES; RETROFIT;
D O I
10.3846/jcem.2010.33
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The effectiveness of construction processes largely depends on the effective contract preparation. To draw an effective contract for construction, the methods of assessment and comparison of these types of contract should be developed. In recent years, multicriteria methods have been widely used for evaluating various complex phenomena. The development of construction evaluation methods requires the analysis of construction technology and organization, as well as economic factors and legal aspects of contracting in construction. In the present investigation, the criteria describing contracts for construction from various perspectives are determined based on the estimates elicited from experts. The weights of nine criteria used in complex evaluation of construction contracts are determined based on the use of the AHP method. The consistency of expert estimates is also assessed. Using multicriteria evaluation methods, construction contracts are compared and the best alternative is determined.
引用
收藏
页码:287 / 297
页数:11
相关论文
共 51 条
  • [1] Evaluating the life cycle of a building: A multivariant and multiple criteria approach
    Banaitiene, Nerija
    Banaitis, Audrius
    Kaklauskas, Arturas
    Zavadskas, Edmundas Kazimieras
    [J]. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2008, 36 (03): : 429 - 441
  • [2] Belaj V, 2008, GRADEV, V60, P625
  • [3] Boskovic D, 2008, GRADEVINAR, V60, P327
  • [4] Multi-objective decision-making for road design
    Brauers, Willem Karel M.
    Zavadskas, Edmundas Kazimieras
    Peldschus, Friedel
    Turskis, Zenonas
    [J]. TRANSPORT, 2008, 23 (03) : 183 - 193
  • [5] MULTI-OBJECTIVE CONTRACTOR'S RANKING BY APPLYING THE MOORA METHOD
    Brauers, Willem Karel M.
    Zavadskas, Edmundas Kazimieras
    Turskis, Zenonas
    Vilutiene, Tatjana
    [J]. Journal of Business Economics and Management, 2008, 9 (04) : 245 - 255
  • [6] BUSHAIT AA, 1994, INT J PROJ MANAG, V12, P133, DOI DOI 10.1016/0263-7863(94)90027-2
  • [7] Solving a sealed-bid reverse auction problem by multiple-criterion decision-making methods
    Cheng, Chi-Bin
    [J]. COMPUTERS & MATHEMATICS WITH APPLICATIONS, 2008, 56 (12) : 3261 - 3274
  • [8] Cheung F.K. T., 2002, CONSTR MANAG ECON, V20, P569, DOI DOI 10.1080/01446190210159818
  • [9] Discrete-event simulation based performance quantification of web-based and traditional bidder inquiry processes
    East, E. William
    Martinez, Julio C.
    Kirby, Jeffrey G.
    [J]. AUTOMATION IN CONSTRUCTION, 2009, 18 (02) : 109 - 117
  • [10] Figueira J, 2005, INT SER OPER RES MAN, V78, P133, DOI 10.1007/0-387-23081-5_4