Critical success factors for public-private partnerships in infrastructure development

被引:459
作者
Zhang, XQ [1 ]
机构
[1] Yellow River Conservancy Committee, Minist Water Resources China, Zhengzhou 450003, Peoples R China
关键词
D O I
10.1061/(ASCE)0733-9364(2005)131:1(3)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Different types of public-private partnerships (PPPs) have been practiced in worldwide infrastructure development with diverse results and a variety of problems have been encountered. A number of factors combine to determine the success or failure of an infrastructure project in terms of its objectives. There is an urgent need for a workable and efficient procurement protocol for improved practices in future PPP projects. As an important step toward the development of such a protocol, this study identifies, analyzes, and categorizes various critical success factors (CSFs) for PPPs in general based on a public-private win-win principle and a systematic research approach that includes case studies, literature review, and interviews/correspondence with international experts. A CSF package is developed that contains five main CSFs, each including a number of success subfactors (SSFs). Relative significances of these CSFs and SSFs are examined based on the results of a questionnaire survey of international expert opinions. Agreement analysis shows that there is a good agreement in the ranking of these CSFs and SSFs between respondents from the industrial sector and those from the academic sector.
引用
收藏
页码:3 / 14
页数:12
相关论文
共 31 条
[1]   Unraveling of BOT scheme: Malaysia's Indah Water Konsortium [J].
Abdul-Aziz, AR .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2001, 127 (06) :457-460
[2]  
[Anonymous], GUIDE PREPARATION EV
[3]  
[Anonymous], 1995, PRIVATIZED INFRASTRU
[4]  
[Anonymous], 2000, BOO BOT PROJECTS COM
[5]  
[Anonymous], INT J PROJECT MANAGE
[6]  
*AS DEV BANK, 1997, TAR TRA 30150
[7]  
Berry C., 1991, PROJECT FINANCE YB 1, P15
[8]   Critical success factors for different project objectives [J].
Chua, DKH ;
Kog, YC ;
Loh, PK .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1999, 125 (03) :142-150
[9]   ARE CONTRACT DISPUTES PREDICTABLE [J].
DIEKMANN, JE ;
GIRARD, MJ .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1995, 121 (04) :355-363
[10]  
Fitzgerald P. F., 1998, INT PROJECT FINANCIN